My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2514 RAINIER AVE 2022-03-01
>
Address Records
>
RAINIER AVE
>
2514
>
2514 RAINIER AVE 2022-03-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2022 10:45:56 AM
Creation date
6/9/2021 10:17:56 AM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER AVE
Street Number
2514
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4/21/2021 F age 2 <br />City of Everett <br />10:30:25AM / <br />INSPECTION ACTIVITY REPORT 7 <br />2/14/2019 2/14/2019 BLDG DWF PARTIAL APPR eTRAKiT Inspection 2/13/2019 9:35 AM SPEE WEST CONST <br />07-EXTERIOR Request CO <br />Exterior Screw Inspection <br />Contact Name: GK Knutson <br />Site Address: 2514 RAINIER AVE <br />Phone:3604219008 <br />e-Mail: nick@gkknutson.com <br />(2/14/2019 10:36 AM DWF) <br />East and south walls only, ok to cover <br />2/22/2019 2/22/2019 BLDG DWF APPROVAL as noted 2/21/2019 7:44 AM SPEE WEST CONST <br />07-EXTERIOR CO <br />Exterior screw pattern on sheathing, Interior <br />ceiling grid <br />Contact Name: GK Knutson <br />Site Address: 2514 RAINIER AVE <br />Phone:3604219008 <br />e-Mail: nick@gkknutson.com <br />(2/22/2019 11:59 AM DWF) <br />West end of building, polyISO sheeting <br />installed as per plans - ok to cover <br />3/22/2019 3/22/2019 BLDG DWF PARTIALAPPR Mechanical rooms on 1st and 2nd floor, <br />11-INSULATION ceiling sound insulation, Accoustic Service <br />Assemble brackets. <br />3/22/2019 3/22/2019 BLDG DWF PARTIAL APPR Drywall nailing, periodically checked. Ok <br />09-DRYWALL to continue. <br />3/22/2019 3/22/2019 BLDG DWF PARTIAL APPR Insulation exterior walls, installed on 1st <br />11-INSULATION floor A 10> & 9 line and M line ok to cover <br />and continue. <br />3/28/2019 3/28/2019 BLDG DWF PARTIAL APPR eTRAKiT Inspection 1st and 2nd floo, court yard and area A <br />08-FRAMING Request insulation ok to cover. <br />4/1/2019 4/1/2019 BLDG DWF PARTIAL APPR eTRAKiT Inspection 3/29/2019 1:12 PM SPEE WEST CONST <br />08-FRAMING Request CO <br />Contact Name: GK Knutson <br />Site Address: 2514 RAINIER AVE <br />Phone:3604219008 <br />e-Mail: nick@gkknutson.com <br />(4/1/2019 11:35 AM DWF) <br />Canopy Ceiling soffit, east end of building, <br />ok to cover. <br />4/4/2019 4/4/2019 BLDG 15-FINAL TMB PARTIAL APPR See Notes (4/4/2019 3:09 PM TMB) <br />Renovation of Locker Room # 172 Only. <br />Ok to occupy this room. <br />4/15/2019 4/15/2019 BLDG TMB CORRECTION eTRAKiT Inspection 4/12/2019 12:09 PM SPEE WEST CONST <br />07-EXTERIOR Request CO <br />Wood Sheathing nailing inspection <br />Contact Name: GK Knutton <br />Site Address: 2514 RAINIER AVE <br />Phone:3604219008 <br />e-Mail: nick@gkknutson.com <br />(4/15/2019 3:16 PM TMB) <br />Firetreated panels @ soffits. <br />Complete missing fasteners as discussed @ <br />inspection. <br />4/30/2019 4/30/2019 BLDG DWF PARTIALAPPR eTRAKiT Inspection Drywall, ok to continue installing. <br />09-DRYWALL Request <br />4/30/2019 4/30/2019 BLDG DWF PARTIAL APPR eTRAKiT Inspection Insulation 237, 235, 232, 231, 229, 227, <br />11-INSULATION Request 223, 226, 232 and 241 with vapor barrier. <br />Ok to cover. <br />INSP12 CfW51>TfM,5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.