Laserfiche WebLink
POPACH SHORT PLAT <br /> 9. CONSTRUCTION SCHEDULE <br /> BMP implementation schedule listed below is keyed to proposed phases of the <br /> construction project, and reflects differences in BMP installations and inspections that <br /> relate to wet and dry season construction. As such, the dry season is considered to be <br /> from May 1 to September 30 and the wet season is considered to be from October 1 <br /> to April 30. <br /> ■ Estimate of Construction start date: 05 / 01 /2018 <br /> • Estimate of Construction finish date: 08 /30/2018 <br /> • Mobilize equipment on site: 05 /01 /2018 <br /> ■ Clear Vegetation From Site and utility placement 05 / 15 /2018 <br /> • Re-grade site for driveway/frontage placement 07/01 /2018 <br /> • Soil Amendments and fine grading 08 / 15 /2018 <br /> • Complete Hydroseeding and Final Soil Stabilization 08 /30/2018 <br /> 10. FINANCIAL/OWNERSHIP AND RESPONSIBILITIES <br /> Current Owner(s): <br /> Vitaliy Popach <br /> 6009 Fleming Street <br /> Everett, WA 98203 <br /> Bonds and Financial Responsibility <br /> Prior to issuance of the grading, the owner/developer is required to establish the <br /> necessary erosion control and drainage bonding with Snohomish County. Along <br /> with that, the permits will require establishing general liability insurance from the <br /> proposed contractor. <br /> 11. ENGINEERING CALCULATIONS <br /> Sediment Pond/Trap <br /> N/A <br /> Diversions <br /> No diversions are needed for this project <br /> Waterways <br /> Construction on site will not have any effect on adjacent waterways. <br /> JOB NO:15-1463-A 6 <br />