• <br /> Popach Short Plat—2 Lots <br /> Off-site Analysis and Mitigation <br />• <br /> A site reconnaissance was done by James Roberson of Western Engineers Inc. on <br /> January 27, 2016 to verify the downstream flow paths. The weather was overcast with a <br /> temperature around 60 degrees. <br />• Upstream Analysis <br /> Possible upstream flows entering onto the site would originate from lawn areas on a <br /> parcel to the north of the site and pavement areas within Fleming Street right-of-way <br /> west of the site.No other upstream flows were observed and there is no evidence of <br />• erosive flows. <br /> Downstream Analysis <br /> Refer to the Downstream Map attached after this section for a detailed depiction of the <br /> downstream drainage course. <br />• <br /> Runoff from the site currently flows easterly and northeasterly into the existing adjacent <br /> parcel to the east(see photos 1 &2). A building on the parcel immediately east of the <br /> site may interfere with sheet flows exiting the site; however, the flows appear not to <br /> cause damage to the building or erosion to the surrounding area. These intercepted flows <br />• appear to travel subsurface around the building and toward Evergreen Way. After the <br /> flow enters into the adjacent parcel it continues approximately 150 feet easterly before <br /> being intercepted by an existing drainage system along the west side of Evergreen Way. <br /> According to City of Everett maps, the flow continues approximately 450 feet north <br />• within the existing drainage system before discharging into the headwater of Pigeon <br /> Creek#1. As this is the closest receiving water, further downstream analysis is not <br /> required. <br /> Drainage Complaints <br />• No known drainage complains found for the site. <br />• <br />• <br /> WESTERN ENGINEERS,INC. 4 PROJECT:15-1463-A <br />• <br />