Laserfiche WebLink
• <br /> Popach Short Plat—2 Lots <br /> Site Basin• <br /> Gross Site Area = 14,074 sf. (0.323 Acres) <br /> Less Right-of-Way Dedication = 438 sf. (0.010 Acres) <br /> Net Site Area = 13,636 sf. (0.313 Acres) <br /> Plus Proposed Frontage = 1,075 sf. (0.025 Acres) <br />• Total Clearing Area = 14,711 sf. (0.338 Acres) <br /> Existing Conditions: <br /> Impervious Area: <br /> Ex. SFR = 925 sf. (To Remain) <br /> Ex. Concrete = 111 sf. (To Remain) <br />• Ex. Concrete = 291 sf. (To Be Removed) <br /> Ex. Carport = 1,230 sf. (To Be Removed) <br /> Ex. Gravel Driveway = 1,025 sf. (To Be Removed) <br /> Ex. Wooden Shed = 85 sf. (To Be Removed) <br /> Ex. Metal Shed = 75 sf. (To Be Removed) <br />• Total = 3,742 sf. (0.086 Ac.) <br /> Of which, Total to Remain Undisturbed = 1,036 sf. (0.024 Ac.) <br /> Existing impervious area on-site to remain shall be analyzed as impervious for <br /> undeveloped runoff analysis. <br />• <br /> Total Pervious Area: <br /> Existing Lawn: 10,969 sf. (0.252 Ac.) <br /> Developed Condition <br />• Site Impervious Area: <br /> Ex. SFR(Lot 1) = 925 sf. (To Remain) <br /> Ex. Concrete (Lot 1) = 111 sf. (To Remain) <br /> Lot 1 New Garage = 480 sf. <br /> *Lot 1 New Permeable Driveway = 1,720 sf. <br /> Lot 2 New SFR Roof = 1,750 sf. <br />• *Lot 2 New Permeable Driveway = 892 sf. <br /> Total = 5,878 sf. (0.135 Ac.) <br /> Frontage Impervious Area: <br /> New Sidewalk = 423 sf. <br /> New Asphalt = 652 sf. <br /> Total = 1,075 sf. (0.025 Ac.) <br /> Total Impervious Surfaces = 6,953 sf. (0.160 Ac.) <br /> Total New/Replaced Hardscape Surfaces = 5,917 sf. (0.136 Ac.) <br />• Total New/Replaced Effective Impervious Surfaces =3,305 sf. (0.076 Ac.) <br /> WESTERN ENGINEERS,INC. 14 PROJECT:15-1463-A <br />• <br />