My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6009 FLEMING ST 2021-06-09
>
Address Records
>
FLEMING ST
>
6009
>
6009 FLEMING ST 2021-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2021 2:47:03 PM
Creation date
6/9/2021 2:44:51 PM
Metadata
Fields
Template:
Address Document
Street Name
FLEMING ST
Street Number
6009
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Popach Short Plat—2 Lots <br /> Table V 4,5,2(22) Maintenance Standards - Permeable Pavement <br />• (continued) <br /> Recommended Fre- Condition <br /> quency a when Main- <br /> Component tenance is Action Needed (Procedures) <br /> Inspection Routine Needed <br /> Maintenance (Standards) <br /> b . Assess <br /> the over- <br /> all per- <br /> formance <br /> of the <br /> pave- <br /> ment sys- <br /> tem <br /> during a <br /> rain <br /> event. If <br /> water <br /> runs off <br /> the pave- <br /> ment <br /> Sediment and/or <br /> A present at the there is <br /> surface of the ponding, <br /> pavement then see <br /> above. <br /> . Determi- <br /> ne <br /> source <br /> of sed- <br /> iment <br /> loading <br /> and eval- <br /> uate <br /> whether <br /> or not <br /> the <br /> source <br /> can be <br /> 2014 Stormwater Management Manual for Western Washington <br /> Volume V- Chapter 4 -Page 894 <br /> WESTERN ENGINEERS,INC. 29 PROJECT:15-1463-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.