My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6009 FLEMING ST 2021-06-09
>
Address Records
>
FLEMING ST
>
6009
>
6009 FLEMING ST 2021-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2021 2:47:03 PM
Creation date
6/9/2021 2:44:51 PM
Metadata
Fields
Template:
Address Document
Street Name
FLEMING ST
Street Number
6009
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Popach Short Plat—2 Lots <br /> Table V-4.5.2(22) Maintenance Standards - Permeable Pavement <br /> i (continued) <br /> Recommended Fre- Condition <br /> quency a when Main- <br /> Component tenance is Action Needed(Procedures) <br /> Inspection Routine Needed <br /> Maintenance• (Standards) <br /> Aggregate Storage Reservoir <br /> Water remains <br /> in the storage If immediate cause of extended <br /> aggregate ponding is not identified, sched- <br /> Observation longer than <br />• A S ule investigation of subsurface <br /> port anticipated by materials or other potential <br /> design after causes of system failure. <br /> the end of a <br /> storm <br /> Vegetation <br />• <br /> . Sweep leaf litter and sed- <br /> Vegetation iment to prevent surface <br /> related fallout clogging and ponding <br /> As needed clogs or will <br /> potentially . Prevent large root systems <br /> clog voids from damaging subsurface <br />• Adjacent structural components <br /> large shrubs Vegetation Edging and trimming of planted <br /> or trees growing bey- areas to control groundcovers <br /> Once in May and facility and shrubs from overreaching <br /> and Once in edge onto the sidewalks, paths and street <br /> September sidewalks, edge improves appearance and <br /> paths, and reduces clogging of permeable <br /> street edge pavements by leaf litter, mulch <br /> and soil. <br /> In fall (Octo- <br />• ber to Decem- <br /> Leaves, ber)after leaf Accumulation Use leaf blower or vacuum to <br /> needles, drop (1-3 of organic blow or remove leaves, ever- <br /> and organic times, debris and green needles, and debris (i.e., <br /> debris depending leaf litter flowers, blossoms)off of and <br /> 111/ on canopy away from permeable pavement <br /> cover) <br /> Note that the inspection and routine maintenance frequencies listed above are recom- <br />• <br /> 2014 Stormwater Management Manual for Western Washington <br /> Volume V- Chapter4-Page 901 <br /> WESTERN ENGINEERS,INC. 36 PROJECT:15-1463-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.