My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6009 FLEMING ST 2021-06-09
>
Address Records
>
FLEMING ST
>
6009
>
6009 FLEMING ST 2021-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2021 2:47:03 PM
Creation date
6/9/2021 2:44:51 PM
Metadata
Fields
Template:
Address Document
Street Name
FLEMING ST
Street Number
6009
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Popach Short Plat—2 Lots <br /> Table V-4.5.2(2) Maintenance Standards - Infiltration (continued) <br />• Results Expec- <br /> Maintenance Defect Conditions When Maintenance Is ted When <br /> Component Needed Maintenance <br /> Is Performed <br /> time allowed for infiltration. Treat- <br />• ment basins should infiltrate Water <br /> Quality Design Storm Volume within and/or facility is <br /> 48 hours, and empty within 24 hours cleaned so that <br /> after cessation of most rain events. infiltration sys- <br /> (A percolation test pit or test of facility tern works <br />• indicates facility is only working at according to <br /> 90% of its designed capabilities. Test design. <br /> every 2 to 5 years. If two inches or <br /> more sediment is present, remove). <br /> Filter bag is <br />• Filter Bags (if Filled with Sed- Sediment and debris fill bag more replaced or sys- <br /> applicable) iment and Debris than 1/2 full. tem is <br /> redesigned. <br /> Sediment and By visual inspection, little or no water Gravel in rock <br /> Rock Filters Debris flows through filter during heavy rain filter is <br />• storms. replaced. <br /> Side Slopes See "Detention <br /> Erosion See "Detention Ponds" (No. 1). <br /> of Pond Ponds" (No. 1). <br /> Emergency See"Detention <br /> Overflow Tree Growth See "Detention Ponds" (No. 1). Ponds" (No. 1). <br /> Spillway and <br />• See"Detention <br /> Berms over 4 piping See "Detention Ponds" (No. 1). <br /> feet in height. Ponds" (No. 1). <br /> Emergency Rock Missing See "Detention Ponds" (No. 1). See "Detention <br /> Ponds" (No. 1). <br /> Overfil wlow <br /> ay Erosion See "Detention Ponds" (No. 1). See "Detention <br />• Spillway <br /> Ponds" (No. 1). <br /> Pre-settling Facility or sump „ <br /> Ponds and filled with Sediments or designed sediment trap depth Sediment is <br /> of sediment. removed. <br /> Vaults and/or debris <br />• <br />• <br /> 2014 Stormwater Management Manual for Western Washington <br /> Volume V- Chapter 4 -Page 834 <br /> WESTERN ENGINEERS,INC. 39 PROJECT:15-1463-A <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.