My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7500 HARDESON RD 2021-06-09
>
Address Records
>
HARDESON RD
>
7500
>
7500 HARDESON RD 2021-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2021 3:46:41 PM
Creation date
6/9/2021 3:44:50 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7500
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 Project Description <br /> The Everett 7-Eleven project proposes to develop 1.32 acres in Everett,Washington. The site is <br /> currently zoned C-2 (Heavy Commercial -Light Industrial). The project is located at 7500 Hardeson <br /> Road on Tax Parcel 28041200305800. Refer to Appendix A-1 for a Vicinity Map and Appendix A-2 I <br /> for the Zoning Map. <br /> The project proposes one 5,000-square foot retail building. Also proposed is a fuel station with I <br /> associated pumps,fuel pad, canopy, and underground tanks. Site improvements include drive <br /> aisles and a drive-thru lane, parking, walkways, and landscaping. Utility improvements include <br /> improved stormwater drainage, a sewer system, and a water system. Access to the development <br /> will be from Hardeson Road and 75th Street SW. <br /> The preliminary plans and report have been prepared to satisfy all requirements of the <br /> Department of Ecology(DOE)2012 Stormwater Management Manual for Western Washington <br /> (SWMMWW). <br /> 3.0 Erosion Control Specialist <br /> The Contractor shall appoint a Certified Erosion and Sediment Control Lead (CESCL) <br /> (BMP C160)for the project. <br /> The duties of the CESCL include: <br /> • Maintaining files onsite at all times, including the Construction SWPPP and any associated <br /> permits and plans. <br /> • Directing BMP installation, inspection, maintenance, modification, and removal. <br /> • Updating all project drawings and the Construction SWPPP with changes made. 1 <br /> • Keeping daily logs and inspection reports. <br /> • Facilitating, participating in, and taking corrective actions resulting from inspections <br /> performed by outside agencies or the owner. <br /> To aid in the implementation of the Construction SWPPP, the members of the SWPP Team <br /> include the following: the Contractor,the CESCL, the City of Everett Inspector,AHBL, and the111 <br /> project geotechnical engineering consultant. The General Contractor will ensure all <br /> housekeeping and monitoring procedures are implemented, while the CESCL will ensure the <br /> integrity of the structural BMPs. The City Inspector, the project geotechnical engineering <br /> consultant, and AHBL will observe construction and erosion control practices and recommend <br /> revisions or additions to the Construction SWPPP and drawings. <br /> 4.0 Existing Site Conditions <br /> 4.1 Existing Cover <br /> The site is not currently developed with any buildings or parking; however, there has been fill <br /> placed on the site within the past couple of years. The site is currently vegetated, with the <br /> exception of the gravel access road that is used for accessing the existing detention and water <br /> quality pond constructed in 2017 as part of the Mtorres America development on the adjacent <br /> parcel to the south. The access road runs along the south edge of the site and connects the <br /> pond to Hardeson Road. <br /> Refer to Appendix A-3 for the Existing Conditions Map. <br /> Construction Sto r rmwate Pollution Prevention Plan <br /> Everett 7-Eleven 2 <br /> 2180309.10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.