My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7500 HARDESON RD 2021-06-09
>
Address Records
>
HARDESON RD
>
7500
>
7500 HARDESON RD 2021-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2021 3:46:41 PM
Creation date
6/9/2021 3:44:50 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7500
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLICIVORKS PERMIT • DateApplied: 4/1/2019 <br /> i/l11PAheoe—A City of Everett Permit Services Public Works Permit#: PW1904-002 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> WI. <br /> Everett,WA 98201 Planning Reference#: PREAPP18-024 <br /> (425) 257-8810 Public Works Fee: $605.00 <br /> 0 5 APR. 2.019 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> HARDESON LLC BART BRYNESTAD, PE I AHBL <br /> 11833 268TH DR NE 2215 N 30TH ST#300 <br /> DUVALL, WA, 98019 TACOMA, WA, 98403 <br /> PHONE: PHONE: 2533832422 <br /> TAX PARCEL ID#: 28041200305800 SITE ADDRESS: 7500 HARDESON RD <br /> DESCRIPTION: REMOVAL OF UNPERMITTED FILL& ROUGH GRADING <br /> This permit scope is for the excavation and removal of unpermitted fill and rough grading of the site. The proposed future project has <br /> not been reviewed or approved. The location of the proposed parking, fuel pad, building, and driveways associated with the <br /> proposed future project are subject to approval of permits that have not yet been applied for or reviewed.Any rough grading <br /> associated with these locations is at the developer's risk and may be required to be relocated pending review of the project. By <br /> purchasing this permit and commencing work, the developer agrees to hold and save harmless the City of Everett from any and all <br /> claims for damages, costs, expenses, or causes of action that may arise because of rough grading of the site prior to reviewed and <br /> approved permit applications for the future proposed development beyond of the scope of this permit. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans and drainage report approved by the City of Everett Public Works DepartmGrt date't_'j <br /> 4/5/2019.Approved plans must remain on job-site at all times. <br /> 5. It is the applicant/contractor's responsibility to ensure coverage under Ecology's Constructiorr,gorri yat gener !_Permit is <br /> obtained and maintained throughout the entire construction duration. s..a t 4 <br /> 6. Inspections are required for all stages of construction.Visit the Cit 's Online PermittingPorta`tat vv?av .01 Via. o F;to formally <br /> q 9 Y p� mow. 9.._. <br /> request all required inspections.An Inspection Handout is provided at permit issuance with instructions on how to ruest..an.- <br /> inspection online. <br /> 7. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upon q; <br /> completion of the project prior to final approval of the permit. <br /> 8. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. +' , <br /> 9. Protect all existing underground utilities (to remain) during construction. <br /> 10.All excavated material shall be hauled to an approved, permitted site. }?' •u- � t .S r' -' <br /> 11.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy=Req!Te$ a-flrlal inspection online <br /> by selecting PW-Site Final within the Online Permitting Portal Inspection Requests when all iteri Fa 6See �crnpletedfp;fi(s <br /> permit. <br /> Public Works Permit Fee Breakdown: <br /> Erosion Control $200.00 <br /> Grade/Fill/Excavate(9,750CY) $365.00 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> / / The undersigned owner/applicant hereby agrees to hold and save <br /> /5204 <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> zi.1 j /,J expenses,or causes of action that may arise because of installation and <br /> ff[ maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public perty damaged thereby. <br /> FINAL INSPECTION Date ( 4f /�� <br /> Approved as Constructed (PW Inspector) Signature of A plicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION. <br /> F/! <br />
The URL can be used to link to this page
Your browser does not support the video tag.