Laserfiche WebLink
I <br /> . Any quarry spalls that are loosened from the pad, which end up on the roadway 1 <br /> shall be removed immediately. <br /> . If vehicles are entering or exiting the site at points other than the construction 1 <br /> entrance(s), fencing (see BMP C103)shall be installed to control traffic. <br /> . Upon project completion and site stabilization, all construction accesses intended I <br /> as permanent access for maintenance shall be permanently stabilized. <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> i <br /> 1 <br /> 1 <br /> I <br /> 1 <br /> 1 <br /> t <br /> 2014 Stormwater Management Manual for Western Washington <br /> Volume 11- Chapter 4 -Page 272 <br />