My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7500 HARDESON RD 2021-06-09
>
Address Records
>
HARDESON RD
>
7500
>
7500 HARDESON RD 2021-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2021 3:46:41 PM
Creation date
6/9/2021 3:44:50 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7500
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> BMP C123: Plastic Covering <br /> Purpose , <br /> Plastic covering provides immediate, short-term erosion protection to slopes and dis- <br /> turbed areas. I <br /> Conditions of Use <br /> Plastic covering may be used on disturbed areas that require cover measures for less I <br /> than 30 days, except as stated below. <br /> . Plastic is particularly useful for protecting cut and fill slopes and stockpiles. Note: 1 <br /> The relatively rapid breakdown of most polyethylene sheeting makes it unsuitable <br /> for long-term (greater than six months)applications. <br /> . Due to rapid runoff caused by plastic covering, do not use this method u slo a of <br /> p p <br /> areas that might be adversely impacted by concentrated runoff. Such areas include <br /> steep and/or unstable slopes. <br /> . Plastic sheeting may result in increased runoff volumes and velocities, requiring <br /> additional on-site measures to counteract the increases. Creating a trough with , <br /> wattles or other material can convey clean water away from these areas. <br /> . To prevent undercutting,trench and backfill rolled plastic covering products. I <br /> . While plastic is inexpensive to purchase, the added cost of installation, main- <br /> tenance, removal, and disposal make this an expensive material, up to $1.50-2.00 <br /> per square yard. <br /> . Whenever plastic is used to protect slopes install water collection measures at the <br /> base of the slope. These measures include plastic-covered berms, channels, and 1 <br /> pipes used to covey clean rainwater away from bare soil and disturbed areas. Do <br /> not mix clean runoff from a plastic covered slope with dirty runoff from a project. <br /> . Other uses for plastic include: <br /> 1. Temporary ditch liner. 1 <br /> 2. Pond liner in temporary sediment pond. <br /> 3. Liner for bermed temporary fuel storage area if plastic is not reactive to the 1 <br /> type of fuel being stored. <br /> 4. Emergency slope protection during heavy rains. I <br /> 5. Temporary drainpipe ("elephant trunk") used to direct water. <br /> 1 <br /> 2014 Stormwater Management Manual for Western Washington <br /> Volume II- Chapter 4 -Page 294 <br />
The URL can be used to link to this page
Your browser does not support the video tag.