My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7500 HARDESON RD 2021-06-09
>
Address Records
>
HARDESON RD
>
7500
>
7500 HARDESON RD 2021-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2021 3:46:41 PM
Creation date
6/9/2021 3:44:50 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7500
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> . Lower speed limits. High vehicle speed increases the amount of dust stirred up , <br /> from unpaved roads and lots. <br /> • Upgrade the road surface strength by improving particle size, shape, and mineral <br /> types that make up the surface and base materials. <br /> • Add surface gravel to reduce the source of dust emission. Limit the amount of fine ' <br /> particles (those smaller than .075 mm)to 10 to 20 percent. <br /> • Use geotextile fabrics to increase the strength of new roads or roads undergoing <br /> reconstruction. <br /> • Encourage the use of alternate, paved routes, if available. <br /> . Restrict use of paved roadways by tracked vehicles and heavy trucks to prevent <br /> damage to road surface and base. <br /> . Apply chemical dust suppressants using the admix method,blending the product <br /> with the top few inches of surface material. Suppressants may also be applied as <br /> surface treatments. ' <br /> . Pave unpaved permanent roads and other trafficked areas. <br /> . Use vacuum street sweepers. ' <br /> . Remove mud and other dirt promptly so it does not dry and then turn into dust. <br /> . Limit dust-causing work on windy days. ' <br /> . Contact your local Air Pollution Control Authority for guidance and training on other <br /> dust control measures. Compliance with the local Air Pollution Control Authority 1 <br /> constitutes compliance with this BMP. <br /> Maintenance Standards ' <br /> Respray area as necessary to keep dust to a minimum. <br /> BMP 150: Materials on an 1 <br /> Purpose I <br /> Keep quantities of erosion prevention and sediment control materials on the project site <br /> at all times to be used for regular maintenance and emergency situations such as unex- ' <br /> pected heavy summer rains. Having these materials on-site reduces the time needed to <br /> implement BMPs when inspections indicate that existing BMPs are not meeting the Con- <br /> struction SWPPP requirements. In addition, contractors can save money by buying some 111 <br /> materials in bulk and storing them at their office or yard. <br /> 1 <br /> r <br /> 2014 Stormwater Management Manual for Western Washington <br /> Volume II- Chapter 4 -Page 311 <br />
The URL can be used to link to this page
Your browser does not support the video tag.