Laserfiche WebLink
1 <br /> . Hydro-demolition <br /> I . Bridge and road surfacing <br /> Design and Installation Specifications <br /> ' Vacuum slurry and cuttings during cutting and surfacing operations. <br /> . Slurry and cuttings shall not remain on permanent concrete or asphalt pavement <br /> overnight. <br /> • Slurry and cuttings shall not drain to any natural or constructed drainage con- <br /> veyance including stormwater systems. This may require temporarily blocking <br /> ' catch basins. <br /> . Dispose of collected slurry and cuttings in a manner that does not violate ground <br /> water or surface water quality standards. <br /> . Do not allow process water generated during hydro-demolition, surface rough- <br /> ' ening or similar operations to drain to any natural or constructed drainage con- <br /> veyance including stormwater systems. Dispose process water in a manner that <br /> does not violate ground water or surface water quality standards. <br /> . Handle and dispose cleaning waste material and demolition debris in a manner <br /> that does not cause contamination of water. Dispose of sweeping material from a <br /> pick-up sweeper at an appropriate disposal site. <br /> Maintenance Standards <br /> IContinually monitor operations to determine whether slurry, cuttings, or process water <br /> could enter waters of the state. If inspections show that a violation of water quality stand- <br /> ' ards could occur, stop operations and immediately implement preventive measures such <br /> as berms, barriers, secondary containment, and vacuum trucks. <br /> BMP 1Material Delivery, Storage and Containment <br /> Purpose <br /> Prevent, reduce, or eliminate the discharge of pollutants to the stormwater system or <br /> watercourses from material delivery and storage. Minimize the storage of hazardous <br /> ' materials on-site, store materials in a designated area, and install secondary con- <br /> tainment. <br /> Conditions of Use <br /> These procedures are suitable for use at all construction sites with delivery and <br /> storage of the following materials: <br /> 2014 Stormwater Management Manual for Western Washington <br /> Volume II- Chapter 4 -Page 315 <br />