Laserfiche WebLink
I <br /> I <br /> I <br /> 1 <br /> I <br /> IConstruction Stormwater <br /> Pollution Prevention Plan <br /> IPREPARED FOR: <br /> ' Bruce McKean <br /> Helix Design Group Inc. <br /> 6021 12th Street East, Suite 200 <br /> I3(22/2019 Tacoma, WA 98424 <br /> E ,p,./ <br /> PROJECT. <br /> I4 .. 1.0* Everett 7-Eleven <br /> r ''' 7500 Hardeson Road <br /> m <br /> e ' : Everett, WA 98201 <br /> I <br /> 41 �' ,5 4 2180309.10 <br /> PREPARED BY: <br /> Tyler D. Watkins <br /> I <br /> I hereby state that this Construction <br /> Stormwater Pollution Prevention Plan for Project Engineer <br /> the Everett 7-Eleven project has been REVIEWED BY: <br /> I <br /> prepared by me or under my supervision <br /> and meets the standard of care and Scott T. Kaul, PE, LEED AP <br /> expertise which is usual and customary in <br /> this community for professional engineers. Project Manager <br /> IIunderstand that City of Everett does not <br /> and will not assume liability for the J. Matthew Weber, PE <br /> sufficiency, suitability, or performance of <br /> Construction SWPPP BMPs prepared by Principal <br /> ' me. <br /> DATE: <br /> IMarch 2019 <br /> I <br /> I <br />