My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7500 HARDESON RD 2021-06-09
>
Address Records
>
HARDESON RD
>
7500
>
7500 HARDESON RD 2021-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2021 3:46:41 PM
Creation date
6/9/2021 3:44:50 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7500
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Report SSGC <br /> Hardeson Road Retail <br /> Everett,Washington <br /> SSGC Project No. 18072 <br /> September. 18,2018. <br /> On-Grade Floor Slabs <br /> On-grade floor slabs should be placed on firm native soils or structural fill prepared as described in this ' <br /> report. We recommend a modulus subgrade reaction of 225 pounds per square inch per inch (psi/in) for <br /> native soil or compacted granular structural fill over native soil. <br /> We recommend a capillary break is provided between the prepared subgrade and bottom of slab. <br /> Capillary break material should be a minimum of 4 inches thick and consist of compacted clean, free- , <br /> draining, well graded course sand and gravel. The capillary break material should contain less than 5 <br /> percent fines, based on that soil fraction passing the U.S. No. 4 sieve. Alternatively, a clean angular <br /> gravel such as No. 7 aggregate per Section 9-03.1(4) C of the 2016 WSDOT (M41-10) manual could be <br /> used for this purpose. <br /> We recommend positive separations and/or isolation joints are provided between slabs and foundations, ' <br /> and columns or utility lines to allow independent movement where needed. Backfill in interior trenches <br /> beneath slabs should be compacted in accordance with recommendations presented in this report. <br /> A vapor retarder should be considered beneath concrete slabs that will be covered with moisture sensitive <br /> or impervious coverings (such as tile, wood, etc.), or when the slab will support equipment or stored <br /> materials sensitive to moisture. We recommend the slab designer refer to ACI 302 and/or ACI 360 for <br /> procedures and limitations regarding the use and placement of vapor retarders. <br /> Seismic Considerations <br /> Seismic parameters and values in Table 2 are recommended based on the 2015 International Building <br /> Code(IBC). <br /> Table 2.Seismic Parameters <br /> mopmempoulmemp <br /> ,'.. . 1 `a,�11 mom . ::.; 0 <br /> gy 111 a• .M.. <br /> 2015 International Building Code(IBC) <br /> Site Classification' 111 <br /> S3 Spectral Acceleration for a Short Period ' 1.473 <br /> Si Spectral Acceleration for a 1-Second Period 0.551 g I <br /> Fa Site Coefficient for a Short Period 1.00 <br /> F„Site Coefficient for a 1-Second Period ! 1.5 <br /> Note:In general accordance with the 2015 International Building Code, Section 1613.3.2 for risk categories <br /> I,II,I1I. IBC Site Class is based on the estimated characteristics of the upper 100 feet of the subsurface profile. <br /> S„ Fa,and F,values based on the USGS US Seismic Design Maps website using referenced site latitude and <br /> longitude. <br /> 1 <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.