My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/06/09 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/06/09 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2021 8:27:54 AM
Creation date
6/9/2021 10:01:01 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/9/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF SERVICES <br />Background <br />The existing 17th Street Interceptor is a major sewage pipeline that conveys wastewater from <br />the Port Gardner Basin and portions of the north end of the City to the Water Pollution Control <br />Facility (WPCF). System analysis of the existing pipeline performed as part of the Port Gardner <br />Storage Facility (PGSF) project indicates that it has inadequate capacity to convey peak wet <br />weather flows. Hydraulic modeling indicates that sections of the pipeline are subject to <br />surcharging that could result in basement backups or surface discharges. Increasing the <br />constricted sections of the pipeline may result in increasing the flow to downstream facilities <br />including the Siphon Headworks and Diversion Structure Zero. This increase in flow could <br />increase the frequency of combined sewer overflows (CSOs) at SRO 3. This in turn may drive <br />the need to accelerate the Diversion Structure Zero improvements. <br />The objective of this project is to determine from existing information or information that may be <br />collected in the near future, the existing and projected loading on the existing interceptor, <br />improvements to eliminate the potential overloading of the interceptor, and develop potential <br />operating strategies for the pump stations within the Port Gardner Basin (Lift Station 4, Lift <br />Station 5), PGSF and control structures associated with the Sewer M basin that could reduce, <br />delay or eliminate other capital improvements. <br />The anticipated phases of this project include: <br />• Phase I: Planning and Predesign — Revise the hydraulic modeling of the sewer collection <br />system to reflect information collected since the last sewer plan and incorporate Sewer <br />M revisions. This will also incorporate the model revisions for the Port Gardner Basin. <br />Develop conveyance improvements to eliminate the constrictions in the interceptor and <br />develop collection system facility operating strategies to minimize other potential <br />improvements. Design of the selected alternative will be developed to 30% design level. <br />• Phase II: Final design - The scope and budget for this phase will be developed upon <br />completion of Phase I. <br />• Phase III: Construction — The scope and budget for this phase will be developed upon <br />completion of Phase I. <br />This first phase of this project will be to complete the planning process by identifying the <br />proposed improvements and assessing downstream impacts to the downstream facilities <br />including the Siphon Headworks and Diversion Structure Zero. The following tasks are included <br />in this scope of work: <br />Task 100 — Project Management <br />Task 200 — Collection System Modeling <br />Task 300 — Alternative Development <br />Task 310 — Project Surveying <br />Task 320 — Geotechnical Investigations <br />Task 400 — Development of System Facility Operating Strategies <br />City of Everett— 17th Street Interceptor Improvements 1 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.