My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
301 W MUKILTEO BLVD ESPRESSO MILANO 2021-06-10
>
Address Records
>
W MUKILTEO BLVD
>
301
>
ESPRESSO MILANO
>
301 W MUKILTEO BLVD ESPRESSO MILANO 2021-06-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2021 9:22:50 AM
Creation date
6/10/2021 9:22:27 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
301
Tenant Name
ESPRESSO MILANO
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intake &Approval Sheet 0 (FOR PERMIT STAFF ONLY) • PERMIT# i;12.00g-ot b <br /> BUILDING PLANNING <br /> Intake OK by: Date: Intake OK by: Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> ❑ Route to Commercial Building ❑Attach to Project No. <br /> ❑ Route to Residential Building ❑ Route to Historic Reviewer <br /> ❑ Make this a"W"Permit ❑ OK to Route to Other Departments <br /> Bldg/Tl/Addn/Rem Size 15'1 1 0 Hold in Planning File Drawer <br /> Garage/Accessory Struct.Size — Zone ,e)--Z <br /> Number of Stories rrtt--,, 1- Overlay/Agreement <br /> Basement l lNo ❑Yes, Fin/Unfin Nonresidential Use 52.breAJzsz. `o <br /> Type of Construction "-t' Residential Use <br /> Occupancy Group '1 ' Proposed No.of Dwelling Units: <br /> Occupancy Load 2 Total No.of Dwelling Units: <br /> Fire Sprinklers: CI Update Existing CI New System Di Not Req'd Planning/Landscape Inspection Required before Final? ❑Yes ' No <br /> Reason Sprinklers Required: "In Lieu"Fee:Type: Amount$ <br /> Fire Alarm: ❑Update Existing CI New System &SI Not Req'd School Impact Fee: Total $ <br /> Reason Fire Alarm Required: Calculated: Credit: <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes ® No ❑Everett School Dist ❑Mukilteo School Dist <br /> Add!RCW 64.55 docs required prior to final? ❑Yes IRINo Additional Notes: O 0 rZ}- y, e'i <br /> VALUATION CALCULATION: Total$ i 00 rp,, o- 4 ' {, a,. poP,-,>r= 41," <br /> Approved By: 1.,,\)' Date: 6..;./..Z"Z,O <br /> PUBLICWORKS <br /> Intake OK by: Date: <br /> Additional Notes: Intake Comments: F pp 3PW Worksheet Needed if: <br /> 9Lu�, V Lb � -uf ko DSys Dev Eval DTraffic Mit Eval <br /> IDSite Work or Drainage Proposed <br /> Approved By: 1 Date: V i 4 2a wo-.' 2 V i. , DBackflow Prevention for high hazard: <br /> ''J (dental,medical,animals,mortuary,hospital, <br /> (((/// ` `0.(gyp supportive housing) <br /> FIRE DEPARTMENT ❑Route this folder for PW Review at end ---PW Review Worksheet <br /> Separate/Deferred Submittals Required: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> ❑Fire Sprinklers ❑Fire Alarm ❑Other: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> Additional Notes: ; ❑This Permit is Approved by Public Works <br /> ❑ See PW Review Worksheet and associated attached items <br /> Fire Dept. Fees: ❑ A Separate PW Permit is Required(Permit#: PW ) <br /> ❑ Review of As-Built Plans-NO FIRE FEE AND ❑ Is located in this folder <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE 0 Is in a Separate Green Folder(join with this folder for permit issuance) <br /> 'Review/Inspection Scope-ADD FIRE FEE 0 Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> Approved By: '1.Ac>..)(A)el Date: l v/.Sa2Q2v ai Public Works has no scope---PW Not Required <br /> Additional Notes: <br /> ELECTRICAL <br /> Additional Notes: <br /> Approved By: Date: Approved By: AM Date: (OKIO <br /> (4p. <br />
The URL can be used to link to this page
Your browser does not support the video tag.