Laserfiche WebLink
11/9/2020 City of Everett page J <br /> 9:07:36AM <br /> INSPECTION ACTIVITY REPORT <br /> 11/6/2019 Any 11/6/2019 MECH 04-ROUGH SDP APPROVAL As noted:stove 11/5/2019 6:28 PM Kevin McCarthy <br /> IN exhaust <br /> Contact Name:Kevin McCarthy <br /> Site Address:3403 W MUKILTEO BLVD <br /> Phone:2062004036 <br /> e-Mail:kmccarthy@microloansnw.com <br /> 11/3/2019 5:14 PM Kevin McCarthy <br /> Contact Name:Kevin McCarthy <br /> Site Address:3403 W MUKILTEO BLVD <br /> Phone:2062004036 <br /> e-Mail:kmccarthy@microloansnw.com <br /> (Canceled-eTRAKiT-11/3/2019 5:19:24 <br /> PM) <br /> (11/6/2019 1:02 PM SDP) <br /> The stove exhaust is not yet installed.We <br /> discussed the methods and materials used <br /> for installation.The owner will email the <br /> inspector a picture when it has been <br /> installed. <br /> Ok to continue with framing and insulation. <br /> 11/8/2019 11/8/2019 BLDG DWF APPROVAL eTRAKiT Inspection 11/6/2019 7:01 PM Kevin McCarthy <br /> 08-FRAMING Request <br /> Contact Name:Kevin McCarthy <br /> Site Address:3403 W MUKILTEO BLVD <br /> Phone:2062004036 <br /> e-Mail:kmccarthy@microloansnw.com <br /> (11/8/2019 10:11 AM DWF) <br /> Ok to insulate,contractor to install seismic <br /> strap on top plate cut out over 50%as <br /> discussed. <br /> Will inspect on insulation inspection. <br /> 11/27/2019 11/27/2019 MECH 04-ROUGH SDP APPROVAL stove exhaust/see <br /> IN attachment <br /> 12/18/2019 12/18/2019 BLDG KMK APPROVAL eTRAKiT Inspection 12/17/2019 3:06 PM Kevin McCarthy <br /> 11-INSULATION Request <br /> Contact Name:Kevin McCarthy <br /> Site Address:3403 W MUKILTEO BLVD <br /> Phone:2062004036 <br /> e-Mail:kmccarthy@microloansnw.com <br /> 12/27/2019 12/27/2019 BLDG KMK APPROVAL eTRAKiT Inspection 12/26/2019 10:05 PM Kevin McCarthy <br /> 09-DRYWALL Request <br /> Contact Name:Kevin McCarthy <br /> Site Address:3403 W MUKILTEO BLVD <br /> Phone:2062004036 <br /> e-Mail:kmccarthy@microloansnw.com <br /> 1/31/2020 1/31/2020 PLUMB 05-OTHER SDP APPROVAL shower pan 1/28/2020 11:33 AM Kevin McCarthy <br /> Water pan inspection for master shower <br /> Contact Name:Kevin McCarthy <br /> Site Address:3403 W MUKILTEO BLVD <br /> Phone:2062004036 <br /> e-Mail:kmccarthy@microloansnw.com <br /> 4/17/2020 4/17/2020 PLUMB 06-FINAL SDP OTHER (4/17/2020 3:15 PM SDP) <br /> Hello Kevin and Dayna, <br /> And if this helps you,all I need to give you <br /> a plumbing final is a kitchen sink and one <br /> working bathroom with hot water.This <br /> happens all the time,with construction, <br /> either the tile or the fixtures are on back <br /> order or delayed for some reason. <br /> To get a mechanical final you would need <br /> heat,a minimum of 68 degrees in all <br /> habitable rooms. <br /> INSP12 CRWsYsTE <br />