My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2226 RAINIER AVE 2021-06-10
>
Address Records
>
RAINIER AVE
>
2226
>
2226 RAINIER AVE 2021-06-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2021 10:22:55 AM
Creation date
6/10/2021 10:22:23 AM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER AVE
Street Number
2226
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3/12/2020 Page <br /> City of Everett <br /> 8:52:17AMVi* ?/ <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. EW1907-003 Site Address 2226 RAINIER AVE <br /> Applied 7/24/2019 Applicant Lot <br /> Approved 7/24/2019 Owner WHITLOCK STACI Block <br /> Issued 7/24/2019 Contractor B&G ELECTRIC Tract <br /> Parent Permit No. CW1805-003 Description CIRCUITS,RE-WIRE,SERVICE,FEEDER FOR DADU CONVEI <br /> Notes <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 7/30/2019 7/30/2019 ELEC 06-ROUGH SKB OTHER 425-786-4649 Garrett <br /> IN Requested call prior to inspection for access <br /> 7/31/2019 7/31/2019 ELEC 06-ROUGH SKB CORRECTION ADU will be unlocked,homeowner will be <br /> IN in main home. <br /> 425-786-4649 <br /> (7/31/2019 11:08 AM SKB) <br /> Separate structure is required to have a <br /> main breaker for the service panel.Install <br /> proper grounding electrode system to <br /> ground rods.Provide Arc Fault Circuit <br /> Interrupters protection for all required <br /> circuits for 210-12.Hood fan cannot be on <br /> small plant circuit.SE cable is not allowed <br /> underground in a conduit. <br /> 7/31/2019 7/31/2019 ELEC 02-GROUND SKB APPROVAL (7/31/2019 11:08 AM SKB) <br /> WORK House to detached building. <br /> 8/1/2019 8/1/2019 ELEC 06-ROUGH SKB NOT READY Home will be unlocked <br /> IN <br /> (8/1/2019 9:34 AM SKB) <br /> Cancel per contract. <br /> 8/2/2019 8/2/2019 ELEC 06-ROUGH SKB APPROVAL as noted. (8/2/2019 9:36 AM SKB) <br /> IN If the panel is moved a reinspection will be <br /> required.Remove the SE cable that feeds <br /> underground. <br /> 8/21/2019 8/21/2019 ELEC 05-SERVICE SKB CORRECTION 425-786-4649 <br /> Ground rods are driven directly under <br /> meter,2nd is on west corner of house <br /> hidden under recycle bins <br /> (8/21/2019 11:57 AM SKB) <br /> Grounding electrode conductor must land <br /> on the ground bus.Service entrance cable's <br /> cannot be longer than 15 feet outside of <br /> boxes.SC cable is not allowed inside the <br /> building for service entrance conductors see <br /> WAC 296-46B-230-043 items(7). <br /> 8/26/2019 8/26/2019 ELEC 05-SERVICE SKB NOT READY Phone:425-7864649 <br /> 8/29/2019 8/29/2019 ELEC 09-FINAL SKB NOT READY 425-786-4649 <br /> 8/29/2019 8/29/2019 ELEC 05-SERVICE SKB CORRECTION (8/29/2019 12:08 PM SKB) <br /> Grounding electrode conductor must land <br /> on the ground bus in the service panel. <br /> Remove the Bond screw in the sub panel. <br /> Number 10 ground wire required to ground <br /> dryer metal box. <br /> 9/4/2019 9/4/2019 ELEC 05-SERVICE SKB APPROVAL <br /> INSP12 1.rRIVIrsYs TEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.