My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7505 SEAWAY BLVD BUS SHELTER 1 2021-06-10
>
Address Records
>
SEAWAY BLVD
>
7505
>
BUS SHELTER 1
>
7505 SEAWAY BLVD BUS SHELTER 1 2021-06-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2021 11:30:51 AM
Creation date
6/10/2021 11:28:53 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7505
Tenant Name
BUS SHELTER 1
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Seaway Transit Center <br /> Design Criteria and Loads KPFF Project No. 1900675 <br /> Foundations and Soils <br /> Criteria as per Geotechnical Investigation Report <br /> Allowable, Including <br /> Allowable Increase for Wind or Seismic <br /> SPREAD FOOTINGS <br /> Soil Bearing - Shallow Foundations 3,000 psf 4,000 psf <br /> COEFFICIENT OF FRICTION 0.5 <br /> BEAM DEFLECTION AND CAMBER <br /> Deflection Criteria <br /> U240 Live Load on Beams (uno) <br /> U180 Superimposed Dead + Live Load on Beams (uno) <br /> Limit Precomposite DL deflection based on camber requirements (see below) <br /> LIVE LOADS <br /> Roof <br /> 25 psf Snow Load (non-reducible) <br /> Drifted Snow per ASCE 7, Section 7 - Ground Snow Load = 20 psf, I = 1.0 <br /> 20 psf Roof Live Load <br /> November 22, 2019 Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.