|
SE 1 /4, NE 1 /4 SEC 1 1 , T. 28 N., R. 4 E., W.M. GENERAL NOTES:
<br /> i Z
<br /> MATCHLINE SEE SHEET E101 1. ALL RACEWAYS IN SHELTERS SHALL BE CONCEALED.
<br /> FHHI- Iis © PHH19 2-2°FVC CONDUITS . 24 �Q 2. RLttR TO DETAL 5/E702 FOR HANDHOLE REQUIREWEPJTS.
<br /> I (T?3) FOR IRRIGATION •g li>� , CHH16 ,� -FIb.'R Or17C 10 -DPi/6�� 3. REFER TO DETAIL 4/E703 FOR SHELTER COLUMN STUB-UP
<br /> Q �•34 K
<br /> n 5 JUNCTION BOX�PHH21 �,, Ali DETAIL
<br /> CHH7\ - 117 0 34`i �> � . 8° 4. ALL RACEWAYS UNDER AREAS Of VEHICULAR TRAFFIC SHALL BE
<br /> \ �. (TYp) 4/0 .�t� `� 5 �� �> 4 ° ENCASED IN 2000PSI CDF.
<br /> / • DPi/6 �7 ¢� 5. DESIGN UGHT LEVELS
<br /> 1111)J a �PHH 3,32,36 G Q> BOARDING:PEDESTRIA WALKWAY: 2fc
<br /> s... �` BOARDING: 15fc
<br /> I• -3- P 4 ® DRIVE IANE: 1.5fc
<br /> PHHB-�- "36 P I:,
<br /> L o o • DP1/2,4,� " Ell CRO"S:VALK: i0fc
<br /> �� L°i DP1/1,3 - - ° 2 • 6,10,18,24,30,3 L4 • ��® _ 6. REFER TO CML FOR EXACT LOCATION OF GRADE LEVEL DEVICES.
<br /> [3 ,_______—
<br /> -Itea• ) �° 1 T 5! ( ''��\ ae] �� _j 24 24 FO FIBER OPTIC
<br /> 7. ALL RACEWAYS SHALL BE LOCATED ON COMMUNITY PROPERTY.
<br /> 0 A 1 (� -PHHS .? pF{H �� 'PHH11 / �, JUNCTION BOX SHEET NOTES:
<br /> >"
<br /> �� t_� Q> 34 , o I A CHH / GROUND RODS LOCATE 12°BELOW FINISH GRADE.
<br /> 1 dam;'"� �Q _P - '--FIBER OPTIC JUNCTION BOX
<br /> L7 um 4 SEE UT2 FOR CONTINUATION ® (2) 2°C, 618 + 2/8G
<br /> —c— .— cam_ ,��>�•5 C� Sb L7 c�24 CHHB (1) 2°C SPARE
<br /> 1°CONDET �J//.
<br /> ROUTE CIRCUIT INDE COLUMN TO LIGHTS AND
<br /> FOR CCTV© 4710 RECEPTACLES.
<br /> CHH // .fl(RI I `� Q> �( ) � (1) 2°C, SPARE
<br /> 118G
<br /> 4OP1/6 <} ( ) r7
<br /> D>Di- 1 " c —c c c `41 �_ 3/4°C, gm + 110 CND
<br /> L4 �>¢� 1' • 0YP3) I ID -E0 41 iQ © 3/4°C, 2110 + 1110 GND
<br /> (TYP) 32© I• © .-< '�j IP1/2©� H-
<br /> 32 � ( 3) L4 W HANDHOLE RUIN TO CML FOR LOCATION. RU-ER TO
<br /> L7 �c c a j (q7 V-In'
<br /> s� 1 = DETAIL 5/E702 FOR REQUIREMENTS.
<br /> Y32 32 6 . �47 � r; M ?., \i/ I. �Q cn
<br /> ® (1) 2'C, 8& 1/8G
<br /> • 19 S�jS P P `� T,32 • F 5 • IP-1 Lw (1) 2°C, SPARE
<br /> A.HAL-_ C
<br /> �b
<br /> 3if PHH
<br /> L -4E1
<br /> sr.
<br /> �`� LEASE MODIFIED TO SPREAD 6 W BACK i0 TELECOM SERVICE BACKBOARD
<br /> o -...,1:] DP1/4©-4131 \--PHH3 FOOTING DESIGN = (2) 1°C IN COLUMN (SECURITY AND DATA)
<br /> -CHH4 EAST, 30 `0 = 11/0G TO SHELTER FOOTING.
<br /> CD
<br /> Q ROUTE LIGHTING CIRCUITS ViA LCP.
<br /> PHH2
<br /> A (2) 2°C, 618&2#8G
<br /> (1) 2°C, 218& 118G
<br /> SITE PLAN — ELECTRICAL 1:3>-FUTURE KIOSK LOCATION: ®(1) 2°C (FOR SWIFT SHELTERS) BACK TO PROVIDE SPREAD FOOTING TO AVOID UTILITY VAULT 25TA STYLE HANDHOLE (1) 2°C,SPARE
<br /> PROVIDE 3/4°C STUB (FROM NEAREST PANEL DPI WITH 316& 118 GND. INTERFERENCE WiTH EXISTING UTILTY. WITH H-20 LOCKABLE FLIP UD. GROUND
<br /> SCALE: 1"=20' POWER HANDHOLE), WiTH CAP, PULL STRING PER UTILITIES STANDARD. (3) 2°C (TELECOM & SECURITY) WiTH CABLES
<br /> AND GRADE MARKER FOR FUTURE KIOSK (1) 2°C TO SWIFT LOAD CENTER 1°C STUB-IN & CAP. (1) 2°C, SPARE
<br /> POWER. PROVIDE 1°C STUB (FROM 11/0 BACK TO MAIN GROUND BAR.
<br /> NEAREST COMMUNICATION HANDHOLE), WiTH ®(1) 1.5°C (COMM) STUB-UP I ::=-ROUTE KIOSK CIRCUIT MA LCP. PREFAB SWIFT SHELTER.
<br /> CAP, PULL STRING AND GRADE MARKER FOR ®CONNECT TO PUD SERVICE. COIL 85' OF
<br /> FUTURE KIOSK COMMUNICATION. ®1.5°C TO ICONIC MARKER (1) 1°C, 218 & 1#8G SERVICE CONDUCTOR IN PUD VAULT. [ FULL SHELTER NON-SWITFT. REFER TO DETAIL 2/E201 FOR
<br /> 5 PROVIDE NEW POWER HANDHOLE EXTEND 4 EXISTING 6*PUD PRIMARY CONDUIT. [-_-. =COMFORT STATION 2 (1) 4°C, 414/0& 1I2G ENLARGED POW.
<br /> EXISTING CONDUIT TO NEW HANDHOLE RLFtH TO DETAIL 1/E201. (1) 4°C, SPARE MOUNT CAMERA ON UGHT POLE AT 12'-0°AEG.
<br /> LOCATION. ®NOT USED. NO TO SERVICE CABINET 1°C FOR COMM.
<br /> o AVOID HIGH CONCENTRATION OF 2
<br /> PROVIDE NEW COMMUNICATIONS HANDHOLE Di.NOT USED. NORTH-SOUTH EXISTING UNDERGROUND
<br /> c. EXTEND EXISTING CONDUIT TO NEW UTiLTT1ES TO REMAIN. REFER TO CML [>-(1) 1_1/4°C (SECURITY) BACK TO MAIN TELECOM BACKBOARD IN MAINTENANCE
<br /> z HANDHOLE LOCATION. DRAWINGS FOR APPROXIMATE LOCATION OF
<br /> �1 TO SHELTER LOAD CENTER BUILDING.
<br /> EXISTING UTILITIES. NARROW SHELTER (NON-SWIFT) REFER
<br /> PROVIDE POWER CONDUIT AND CONDUCTORS ®AVOID HIGH CONCENTRATION OF EAST-WEST 4 BASE BID. PROVIDE RACEWAYS ONLY& TO DETAIL 3/E201 1°C FOR SECURITY
<br /> TO NEW COVERED SHELTER. EXISTING AND NEW UNDERGROUND UTILITIES.
<br /> �i_.,Vw.�,vV,.-ti GROUNDING. DEDUCT BR)ALTERNATE UNTIED 3 1°C FOR FUTURE POWER UP TO PANO_DP1
<br /> PROVIDE COMMUNICATIONS CONDOR AND EXISTING UNDERGROUND TELECOM & TO ALL WORK ABOVE GRADE. RUIN TO
<br /> CABLES TO NEW COVERED SHELTER. DRAWING ST1 FOR ALTERNATE INFORMATION.
<br /> `� SECURITY CONDUITS WfTH CABLES. (1) 2°C, 618 & 18G KIOSK.PROVIDE POWER. COMM, UC-HTTNG & /4 GROUNDING
<br /> COORDINATE EXACT LOCATION OF EXISTING 1 2°C, SPARE TO NEAREST GROUND ROD.
<br /> COMMUNICATION CONDUITS AND RELOCATE ® 4/0 TO PUD TRANSFORMER. ( )
<br /> AND PROVIDE NEW TO ACCOMMODATE NEW 2 ELECTRICAL SERVICE CABINET. FRONT FACES WEST.
<br /> w BUS SHELTER FOOTINGS. REMOVE EXISTING PUD VAULT AND TRANSFORMER PAD. (2) 2°C (TELECOM & SECURITY CABLES)
<br /> TELECOM &SECURITY CABLING BETWEEN
<br /> COMPLY TO PUD GUIDELINES AND DRAWING (1) 2°C (COMCAST) --- _ -°•-- �^-�^- �-�-- -- - -.._.. .
<br /> c?,- DEVICE AND PATCH PANELS. PROVIDE NEW )
<br /> 3799igi
<br /> -329.MAINTAIN MINIMUM CLEARANCES CALL 2 BUSINESS DAYS BEFORE YOU DIG illiiIIIIII
<br /> "'-
<br /> TELECOM &SECURITY CABLING, i PER PUD T&D GUIDELINES. 3�i ENTRt SIGN, FRONT SIDE. LIGHT TYPE \
<br /> SCALE TERMINATIONS AND ILSIING BETWEEN DEVICE L11 & SERVICE DISCONNECT, 2 1 800 424 5555
<br /> AND PATCH PANELS. (1) 4°PRIMMARY CONDUIT. STUB 5' EAST GROUND RODS& /4 BOND. SEE
<br /> OF EXISTING 6°PRIMARY CONDUIT.ALL DETAILS ON PV2 FOR EXACT
<br /> 20 0 20 40 5 BENDS SHALL BE PVC COATED RIGID STEEL EQUIPMENT LOCATION. UTILITIES UNDERGROUND LOCATION CENTER
<br /> - FEET
<br /> 5 -8/15/18 A80111as+t,e�S a JAL cS, F*^'i,.�1s"I - o�,By oa,., 9^aiF COMMUNITY TRANSIT Droving"a
<br /> 4 8/15/19 AS-HILT - 1 MN - .w. ` < Via, •1 - 21/R�/,7 E 1 0 2
<br /> 3 s/m/te rs115a see s4m 'a''"�` Aed�' l ... SEAWAY TRANSIT CENTER
<br /> 2 2/14/17 u 2 ,y1 ,,� IZ1 Y.6 PERMIT SET r .a ay o,/o5/17 vim,'-20'
<br /> 1 2/17/17 ,,, SITE PLAN .°`"°.
<br /> E t at+ v,los/,7 '� %� j
<br /> 77.
<br /> .D. R� _, �:. ,�., �, ram, y ELECTRICAL `��i of Total
<br /> „o,ss.o2� /
<br />
|