My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> ITEM UNIT <br /> INO. DESCRIPTION UNIT EST. QTY PRICE CONTRACT PRICE <br /> I 2049 RECORD DRAWINGS LS 1 $ $ <br /> I 218 BASELINE COVID-19 <br /> REQUIREMENTS LS 1 $ $ <br /> 22. . FORCE ACCOUNT LS 1 $200,000 $200,000 <br /> II SUB-TOTAL $ <br /> ISALES TAX (9.8%) $ <br /> TOTAL BID $ <br /> i 1.3 ACCEPTAN <br /> CE <br /> IA. This offer shall be open to acceptance and is irrevocable for 60 days from the Bid <br /> closing date. <br /> IB. If this Bid is accepted by the Owner within the time period stated above, we will: <br /> 1. Execute the Agreement within 14 days of receipt of Notice of Award. <br /> I2. Furnish the required 100% payment and 100% performance bonds within 7 days <br /> Y <br /> of receipt of Notice of Award in the form described in Supplementary Conditions. <br /> I3. Commence Work within seven days after receipt of Notice to Proceed. <br /> I C. If this Bid is accepted within the indicated time, and we fail to commence the Work or <br /> we fail to provide the required bonds, the Bid security shall be forfeited as damages <br /> to the Owner by reason of our failure, limited in amount to the lesser of the face <br /> I value of the Bid security or the difference between this Bid and the Bid upon which <br /> Contract is signed. <br /> I D. In the event our Bid is not accepted within the time stated above, the required Bid <br /> security will be returned to the undersigned, according to the provisions of the <br /> Instructions to Bidders, unless a mutually satisfactory arrangement is made for its <br /> Iretention and validity for an extended period of time. <br /> 1.4 CONTRACT TIME <br /> IA. If this Bid is accepted, we will: <br /> I 1. Begin work within 7 days after receiving Owner's letter of Notice to Proceed and <br /> to reach Substantial Completion within the dates required under the Contract <br /> Documents. <br /> I <br /> Replacement of Reservoir 2 Bid Form <br /> IWO# UP3658 00 41 13 -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.