Laserfiche WebLink
4.15 TRENCH EXCAVATION 22 <br /> 4.16 OWNER-CONTRACTOR COORDINATION 22 <br /> 4.17 MEETINGS WITH OWNER 23 <br /> 4.18 COOPERATION WITH OTHERS 24 <br /> ARTICLE 5 PROGRESS AND COMPLETION 24 <br /> 5.1 Notice to Proceed 24 <br /> 5.2 Contract Time 24 <br /> 5.3 Suspension Procedures 28 <br /> 5.4 Termination Procedures 28 <br /> 5.5 Possession and Use of Completed Portions of the Work 32 <br /> 5.6 Possession of Incomplete Portions of the Project 32 <br /> 5.7 Substantial Completion 32 <br /> 5.8 Acceptance of Work 33 <br /> ARTICLE 6 CHANGES 33 <br /> 6.1 Owner's Right to Direct Changes to the Work 33 <br /> 6.2 Extra Work 34 <br /> 6.3 Change Orders 34 <br /> 6.4 Value Engineering and Cost Sharing 35 <br /> ARTICLE 7 LABOR STANDARDS 35 <br /> 7.1 Wages of Employees 35 <br /> 7.2 Payment Certificates 36 <br /> 7.3 Hours of Labor 37 <br /> 7.4 Contract Work Hours 37 <br /> 7.5 Overtime Work 38 <br /> 7.6 Labor Relations 38 <br /> ARTICLE 8 MATERIAL, EQUIPMENT, WORKMANSHIP AND CONSTRUCTION UTILITIES 39 <br /> 8.1 General 39 <br /> 8.2 Product Data 39 <br /> 8.3 Quality 39 <br /> 8.4 Material and Equipment Specified by Name 40 <br /> 8.5 Requests for Substitution 40 <br /> 8.6 Demonstration of Compliance with Contract Requirements 40 <br /> 8.7 Defective Work 42 <br /> 8.8 Materials and Equipment Furnished by Owner 43 <br /> 8.9 Guarantee 43 <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 2 <br />