Laserfiche WebLink
I <br /> I © GENERAL NOTES <br /> A.SEE SHEET E13 FOR CIRCUIT SCHEDULE. <br /> • <br /> MAIN <br /> UTILITY -240/120V MTS <br /> XFMR <br /> METER <br /> BASE O ( <br /> I 200/2 INI <br /> O <br /> • <br /> 10,3W <br /> I ° <br /> 1 <br /> I / <br /> 6 <br /> TO <br /> PRIMARY 4 AWG J PANEL <br /> VAULT © © BARE CU © r <br /> 240/1/120V <br /> I O 10,3W <br /> 200A <br /> MLO <br /> r IlkTERMINAL <br /> WATER BLDG 1-BOX O O ® 0 1111> <br /> • <br /> PIPE REBAR <br /> I <br /> E/ONE <br /> CP 30 <br /> --- BRRIDGEANE/ 1 ®WP PWP 1WP <br /> HOIST CP I GFI GFI GFI <br /> 1 1 <br /> © 1 <br /> 30 30 30 I 1 30 <br /> 1 <br /> PLY- Oi® @@400 100@ <br /> PANEL: A BUS: 22S A DATE:03/03/21 VOLTAGE: 120 / 240 VOLTS, 1 PHASE.3 WIRE 5 D- <br /> FEEDER: SEE ONE-LINE DIAGRAM MAIN BRKR: NONE MOUNTING:SURFACE 0 a D¢ 4- J (0 0. Q r z <br /> CKT CKT BK0. LOAD LOAD LOAD LOAD CKT BKR CKt z 0 Z 0 p uaai a `�L- uv0 o- <br /> N0. CIRNRDESCRIPTION AMPS/POLE TYPE VA PHASE VA TYPE AMPS/POLE CIRCUIT DESCRIPTION NO. FE O O O p- = O K w Q Q 0 Q Z C <br /> t7d ¢� �H < x I- m xa .Lf> mo > )C] <br /> 1 LIGHTS,EXTERIOR(DOOR/FLOOD) 1-20 L 68 A 1100 p 1-20 RECEPTACLES.STORAGE ARENFLR ORB TRAP PRIMER 2 <br /> 3 LIGHTS,AREA(LCP) 1-20 L 318 B LOBO R 1-20 RECEPTACLES,STORAGE AREA/BATH 4 SUMP PUMPS <br /> 5 UGHTS,STORAGE AREA 1.20 1 495 A 720 R 1-20 RECEPTACLES,SCADA ROOM/ME72 6 <br /> 7 UGHTS,SCADA ROOM/BATHROOM/EF I 1-20 L 627 B 720 R 1-20 RECEPTACLES,SCADA ROOM/MEZL 8 <br /> 9 VAULT LIGHTS 1.20 L 66 A 2088 CM 2-30 AIR HANDLER(AH-1) 10 <br /> Il MAG FLOW METER 1 1-20 500 8 2088 CM <br /> 13 GRINDER POMP(E/ONE) 1-20 M 696 A 543 M 2-20 HEAT PUMP LHP-31 14 ONE-LINE DIAGRAM <br /> 15 C12 ANALYZER 1/SAMPLE PUMP I 1-20 200 8 543 M 16 <br /> 17 CL1 ANALYZER 7/SAMPLE PUMP 2 1-20 200 A 780 M 2-20 MINI-SPUT(HP-2 AND AH-2) 1H SCALE: N.T.S. <br /> 19 ROLL-UP DOOR 1-20 M 1176 8 780 M - - 20 <br /> 21 BRIDGE CRANE/HOIST CONTROL PANEL 2-30 M 2880 A 3600 N 2-40 WATER HEATER(TANKLESS) 22 <br /> I <br /> 23 - - M 2B80 B 3600 H - 24 <br /> 25 BATHROOM HEATER 1-20 H 1000 A 750 M 1-20 SEISMIC SENSOR PANEL ^ K1� 26 <br /> n o 17 SPARE 1-20 B 750 M 1-20 E 1 J�C TZ1i( _ 28 <br /> 29 SPARE 1-20 A 864 M 1-20 FLOW VAULT SUMP PUMP I/3HP 30 <br /> '"2 31 SPARE 1-20 8 864 M 1-20 BACLFLOW VAULT SUMP PUMP I/3HP 32 <br /> .8 233 SPARE 1-20 - A 1260 R 1-20 SEISMIC VW,VAULTS.RES TOPS,8 UGHT POLE RECEPTS 34 <br /> S if 35 SPARE 1-20 B 864 M 1-20 UNDERDRAIN SUMP PUMPI/3HP 36 <br /> `z 37 SPARE 1-20 A 1-20 SPARE 36 <br /> 39 WELDING RECEPTACLE(2408.SOA) 2-50 4800 B 1-20 SPARE 40 LOAD SUMMARY <br /> E o 41 - 4800 A 1-20 SPARE 42 <br /> i 3 <br /> ➢n CONNECTED LOAD .......NOTES......_... PANEL RECEPTACLES MOTOR KITCHEN LIGHTING ELEC HEAT GENERAUMISC LARGEST MOTOR TOTAL(Vial <br /> At 3o A 4,580 14.369 0 1.574 8,200 10800 4,176 39,523 <br /> LOAD PER PHASE(VA) A= 21,910 VA L <br /> G W B. 21.790 VA CONNECTED(VA) 4980 14,369 0 1,5]4 8,I00 10.508 4,176 43,699 <br /> u p 2. <br /> o r CODE FACTOR 111K.50% LOOK ]00K 12516 100% 100% 125% <br /> LOAD PER PHASE(AMPS) A= ]82.6 A 3. CALCULATED(VA) 4.880 14.369 0 1,968 5,200 10.500 5,2M 45.137 <br /> B. 161.6 A TOTAL CONNECTED LOAD 44 KVA <br /> L�'I m 4. €6120/240Y/3PH 162.1 AMPS <br /> 0 8 <br /> Cr0.i TOTAL LOAD IKVA) 43.] KVA S. TOTAL DEMAND LOAD 45 KVA <br /> TOTAL LOAD AMPS 182.1 A @120/240V/IPH 186.1 AMPS <br /> C <br /> s <br /> W m PANEL "A" SCHEDULE <br /> 0 <br /> 5 v SCALE: N.T.S. <br /> g <br /> .0 W <br /> 5 0>. P415S A.W.An Swann. <br /> (2 PA.lm <br /> 7 ;mFitC;VJ/`vY/ e... .ONO.,9ra5 <br /> PI„.n <br /> = ENGINEERING,INC.Prooec 28 mn <br /> a»sa�.sr.�rm.dsda=.u' <br /> 9E'i = Prged No.:481121 COI Contort JEFF 1-10/6610 <br /> 2 t <br /> _ <br /> 3 V �HMS <br /> KM <br /> 0Lelv WA5'1%. E y E R E T T REPLACEMENT OF RESERVOIR 2 ELECTRICAL Drawing E2 — <br /> Drawn <br /> g E 1� 3/5/2021 1LH PER ADDENDUM NO.S ° � sN �W�� PUBLIC WORKS <br /> NO. DATE jAPRVD REVISION Des�Renew Level u' IQ murra sm�7h� _ /26 <br /> PLANS ISSUED FOR O ,ice Y 3200 Cedar Street ONE LINE DIAGRAM, LOAD SUMMARY 1 <br /> aBID CONST RECORD FS FGISTE?B%` Everett WA 98201 WORK ORDER UP3658 <br /> = S/GNAT Ea ,s 425-25�88D0 PPP eTTWD.9aP & PANEL SCHEDULE <br /> ACTION DATE APRVD ACTION DATE APRVD ACTION DATE 1 APRVOTotal <br />