Laserfiche WebLink
1 <br /> 6. Tank Prestressor Superintendent: Within the 10years P prior to Bid opening, the Tank <br /> Prestressor's Superintendent for the Project must have completed at least one <br /> project, as the project superintendent, that each included prestressing activities I <br /> during the construction of externally strandwrapped prestressed concrete water <br /> tanks with a volume of at least 1.0 million gallons. The Tank Prestressor's <br /> Superintendent shall have been in the direct employment of the tank prestressor for <br /> both of the tanks listed. The Tank Prestressor's Superintendent shall be a certified <br /> shotcrete nozzleman in accordance with ACI 506. <br /> List the Tank Prestressor Superintendent name and projects that show that he or she has this <br /> experience. U <br /> Name: <br /> I <br /> PROJECT NAME YEAR OWNER LOCATION AND SIZE <br /> I <br /> I <br /> Furnish references for information concerning all work listed above <br /> NAME TITLE PHONE NUMBER EMAIL ADDRESS I <br /> I <br /> I <br /> 7. Pipeline Contractor/Subcontractor: Within the last ten (10) years the Pipeline <br /> Contractor/Subcontractor must have completed at least three (3) projects that <br /> include the construction of welded joint steel pipe with a diameter of 36-inches or I <br /> greater. <br /> List the Pipeline Contractor/Subcontractor's projects that show this experience. <br /> Name: <br /> PROJECT NAME YEAR OWNER LOCATION AND SIZE <br /> I <br /> I <br /> Replacement of Reservoir 2 Bidder Qualification Statement <br /> WO# UP3658 00 45 13 - 8 <br />