My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 6. Tank Prestressor Superintendent: Within the 10years P prior to Bid opening, the Tank <br /> Prestressor's Superintendent for the Project must have completed at least one <br /> project, as the project superintendent, that each included prestressing activities I <br /> during the construction of externally strandwrapped prestressed concrete water <br /> tanks with a volume of at least 1.0 million gallons. The Tank Prestressor's <br /> Superintendent shall have been in the direct employment of the tank prestressor for <br /> both of the tanks listed. The Tank Prestressor's Superintendent shall be a certified <br /> shotcrete nozzleman in accordance with ACI 506. <br /> List the Tank Prestressor Superintendent name and projects that show that he or she has this <br /> experience. U <br /> Name: <br /> I <br /> PROJECT NAME YEAR OWNER LOCATION AND SIZE <br /> I <br /> I <br /> Furnish references for information concerning all work listed above <br /> NAME TITLE PHONE NUMBER EMAIL ADDRESS I <br /> I <br /> I <br /> 7. Pipeline Contractor/Subcontractor: Within the last ten (10) years the Pipeline <br /> Contractor/Subcontractor must have completed at least three (3) projects that <br /> include the construction of welded joint steel pipe with a diameter of 36-inches or I <br /> greater. <br /> List the Pipeline Contractor/Subcontractor's projects that show this experience. <br /> Name: <br /> PROJECT NAME YEAR OWNER LOCATION AND SIZE <br /> I <br /> I <br /> Replacement of Reservoir 2 Bidder Qualification Statement <br /> WO# UP3658 00 45 13 - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.