My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specifications, such as catalog cuts and shop, working or detail drawings. In its Submittals, <br /> the Contractor shall expressly and explicitly notify the Owner's Representative of any and <br /> all deviations from the Specifications. Without express and explicit Notice of a deviation <br /> from the Contract requirements, approval of a Submittal does not relieve Contractor from <br /> complying with Contract requirements. The Owner's approval of a Submittal does not <br /> constitute a waiver of the Contract requirements. The Owner or Owner's Representative <br /> shall respond to a Submittal within thirty (30) days of receipt. The Owner or Owner's <br /> Representative may extend this time for good cause by notifying the Contractor. The <br /> Owner will not be obligated to accept or pay for Work performed by the Contractor that <br /> may be affected by materials, Equipment, or methods of work not submitted in a timely <br /> manner so that final review can be accomplished before the affected Work is complete. <br /> The Owner shall not be responsible for Delays, inefficiencies, or any additional costs or <br /> expenses caused in whole or in part by Contractor's failure to submit required information <br /> in sufficient time for review, comment, and correction. Contractor's failure to submit <br /> required information in sufficient time for review, comment and correction shall be <br /> deemed a waiver of any and all Contract Claims for adjustment of Contract Sum or Contract <br /> Time arising out of, or related to, such a Submittal. Contractor acknowledges and agrees <br /> that it may not rely upon receiving the Owner's response to a Submittal in less than thirty <br /> (30) days, unless the Owner explicitly changes this section by a signed Change Order. <br /> Requests for information or clarification from the Contractor to the Owner shall be treated <br /> as a Submittal. <br /> 2.5 Contractor's Copies of Contract Documents <br /> A. The Contractor shall keep at the construction site at least one set of Contract Documents <br /> and one set of full-size Drawings that shall be available to the Owner's Representative and <br /> Owner. <br /> ARTICLE 3 OWNER <br /> 3.1 General <br /> A. The Owner, and the Owner's Representative, shall have the authority to act as the sole <br /> judge of the Work, Equipment and materials with respect to both quantity and quality as <br /> set forth in the Contract. It is expressly stipulated that the Drawings, Specifications and <br /> other Contract Documents set forth the requirements as to the nature of the completed <br /> Work and do not purport to control the method of performing Work except in those <br /> instances where the nature of the completed Work is dependent on the method of <br /> performance. <br /> B. The Owner has the authority to act, do, perform, and make any all decisions and actions <br /> authorized by the Contract Documents, including, but not limited to, Change Orders, <br /> progress payments, Contract decisions, acceptability of the Contractor's Work, and early <br /> possession. The Owner has the authority to accept or reject requests for progress <br /> payments that have been submitted by the Contractor and recommended by the Owner's <br /> Representative. The Owner has the authority to make determinations of the acceptability <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.