My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.8 Safety <br /> A. The Contractor alone shall be responsible for safety on the job Site, including, but not <br /> limited to, the safety of its and its Subcontractor's employees. The Contractor shall <br /> maintain the Project Site and perform the Work in a manner which meets the Owner's <br /> responsibility under statutory and common law for the provision of a safe place to work. <br /> 4.9 Threats, Intimidation and Harassment Forbidden <br /> A. Contractor shall not allow its employees, its Subcontractors, its Subcontractors' <br /> employees, or any other agents to threaten bodily injury or property damage,to intimidate <br /> or attempt to intimidate any person, or to assault or physically harass any person. <br /> Forbidden conduct includes, but is not limited to,threatening, appearing, or actually doing <br /> any of the following: pushing, shoving, striking, physically blocking a person or a person's <br /> vehicle, vandalism, malicious mischief, or any other act that a reasonable person would <br /> understand be intended to intimidate, cause personal injury, or cause property damage. <br /> Contractor shall remove from the job site any person reasonably under its control or <br /> direction who the Contractor or Owner reasonably believes violated this section. The lack <br /> of a request from the Owner or Owner's Representative to the Contractor to remove <br /> someone from the job Site does not relieve the Contractor from its obligation to remove <br /> someone. <br /> 4.10 Weapons Forbidden <br /> A. Contractor shall not allow its employees, its Subcontractors, its Subcontractors' <br /> employees, or any other agents or representatives to carry or possess, openly or <br /> concealed, explosives or weapons on the job Site, except: (a) such explosives are as <br /> reasonably required for performance of the Work, such as those necessary for blasting or <br /> demolition work called for by the Contract Documents or (b) commissioned law <br /> enforcement officers or security personnel under authority of their commission. A weapon <br /> is any object, instrument or chemical which is (1) designed in such a manner to inflict harm <br /> or injury to another person; or (2) any item used in a manner threatening harm or injury <br /> to another person. Weapons include, but are not limited to, firearms, dangerous knives, <br /> dangerous chemicals,tear gas, martial arts weapons, blackjacks or other weapons. Further, <br /> weapons should include those delineated in EMC Chapter 10.78. Possession of mace, <br /> pepper spray or the like for defensive purposes is not a violation of this policy. Contractor <br /> shall remove from the job Site any person reasonably under its control or direction who <br /> the Contractor or Owner reasonably believes violated this section. The lack of a request <br /> from the Owner or Owner's Representative to the Contractor to remove someone from <br /> the job Site does not relieve the Contractor from its obligation to remove someone. <br /> 4.11 Safety Standards <br /> A. The Contractor shall comply with Section 107 of the Contract Work Hours and Safety <br /> Standards Act (40 U.S.C. 327-330) as supplemented by Department of Labor Regulations <br /> (29 CFR, Part 5). Under this section, the Contractor shall not require any laborer or <br /> mechanic to work in surroundings or under working conditions that are unsanitary, <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.