My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
involved in the Dispute. The schedule of prevailing wage rates as determined by the <br /> Industrial Statistician for the locality or localities where this Contract will be performed <br /> are by this reference made a part of this Contract as though fully set forth herein. The <br /> Contractor shall be held responsible for notifying its Subcontractors of these wage <br /> requirements. Failure by either the Contractor or any Subcontractors to comply with <br /> requirements of Chapter 39.12 RCW will result in delay of payment to the Contractor <br /> and/or imposition of other sanctions as may be available under the law and this <br /> Contract. <br /> B. Contractor's Responsibility <br /> 1. The Contractor will be held responsible for paying not less than the prevailing wages, <br /> including increases in such wages, over the term of this Contract. It is, therefore, <br /> imperative that the Contractor and its Subcontractors familiarize themselves with the <br /> wage rates before submitting bids based upon these Specifications. <br /> C. Federal Labor Requirements <br /> 1. Contractor shall comply with applicable federal laws and regulations relating to <br /> workers, safety and labor. <br /> 7.2 Payment Certificates <br /> A. The Contractor and each Subcontractor on or before the date of commencement of the <br /> Work shall file a statement of"Intent to Pay" prevailing wages under oath with the Owner <br /> and with the Washington State Department of Labor and Industries certifying the rate of <br /> hourly wage including the usual benefits paid and to be paid each classification of laborers, <br /> workmen, or mechanics employed upon the Work by the Contractor or its Subcontractor <br /> that shall not be less than the prevailing rate of wage. No payment will be made to the <br /> Contractor prior to the submission of such statements and the issuance by the Industrial <br /> Statistician of said Department of an acknowledgment of approval. Such statement and <br /> any supplemental statements that may be necessary shall be filed in accordance with the <br /> practices and procedures required by the Department of Labor and Industries. Upon the <br /> completion of the Work, the Contractor and all of its Subcontractors shall submit affidavits <br /> of wages paid to the Department of Labor and Industries in such form as may be required <br /> by said Department. Payment of the retained percentage will not be made until <br /> certification is received from the Department of Labor and Industries that the prevailing <br /> wage requirements of state law have been satisfied. <br /> B. Any fees charged by the Department of Labor and Industries for filing such statements or <br /> submitting such affidavits shall be the responsibility of the Contractor, and each <br /> Subcontractor; if, for any reason, the Owner pays such fees, then the Contractor shall be <br /> charged the amounts thereof. <br /> C. The Owner will require payroll reports for the Contractor and every Subcontractor be <br /> submitted weekly to the Construction Division, Public Works Annex, 3101 Cedar Street, <br /> Everett, Washington 98201. The payroll reports shall contain the following information: <br /> 1. Name and residence address of each worker. <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.