My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Before Work is started, the Owner's Representative may require the Contractor to <br /> obtain multiple quotations for the service to be utilized and select the provider with <br /> prices and terms most advantageous to the Owner. <br /> 3. In the event that prior quotations are not obtained and the service invoice is <br /> submitted by the Subcontractor, then after-the-fact quotations may be obtained by <br /> the Owner's Representative from the open market in the vicinity and the lowest such <br /> quotation may be used in place of the submitted invoice. <br /> B. Except as noted below, the Owner will pay the Contractor an additional twenty-one (21) <br /> percent of the sum of the costs included on invoices for specialized services to cover <br /> project Overhead, general company Overhead, profit, bonding, insurance, Business & <br /> Occupation tax, and other costs incurred. <br /> C. When a Supplier of services is compensated through invoice, but acts in the manner of <br /> Subcontractor, as described in 9.13 For Contractor Markup of Subcontractors Work of this <br /> provision, then markup for that invoice shall be according to 9.13 For Contractor Markup <br /> of Subcontractors Work. <br /> 9.12 Force Account For Mobilization. <br /> A. Force Account mobilization is defined as the preparatory work performed by the <br /> Contractor including procurement, loading and transportation of tools and equipment, and <br /> personal travel time, when such travel time is a contractual obligation of the Contractor or <br /> a customary payment for the Contractor to all employees. <br /> 1. Mobilization also includes the costs incurred during demobilization applies to both <br /> Force Account and other Contract Work. <br /> 2. Owner will pay for mobilization for off-site preparatory work for Force Account items <br /> provided that Notice has been provided sufficiently in advance to allow the Owner's <br /> Representative to witness the activity, if desired. <br /> B. Any costs experienced during mobilization activities for labor, equipment, materials or <br /> services shall be listed in that section of the Force Account summary and paid accordingly. <br /> 9.13 Force Account For Contractor Markup on Subcontractor's Work. <br /> A. When Work is performed on a Force Account basis by one or more approved <br /> Subcontractors, by lower-tier Subcontractors or Suppliers, or through invoice by firm(s) <br /> acting in the manner of a Subcontractor, the Contractor will be allowed an additional <br /> markup, from the table below, applied to the costs computed for Work done by each <br /> Subcontractor through 9.9.A, 9.7.B., 9.7.C, and 9.7.D, to compensate for all administrative <br /> costs, including project Overhead, general company Overhead, profit, bonding, insurance, <br /> Business & Occupation tax, and any other costs incurred. <br /> B. A firm may be considered to be acting as a Subcontractor when the Owner's <br /> Representative observes one or more of the following characteristics: <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.