My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. At the option of the Contractor; monies retained under the provisions of RCW 60.28 shall <br /> be: <br /> 1. Retained in a fund by the Owner, or <br /> 2. Deposited by the Owner in an escrow (interest-bearing) account in a bank, mutual <br /> saving bank, or savings and loan association (interest on monies so retained shall be <br /> paid to the Contractor). Deposits are to be in the name of the Owner and may not be <br /> withdrawn without the Owner's written authorization. The Owner will issue a check <br /> representing the sum of the monies reserved, payable to the bank or trust company. <br /> Such check shall be converted into bonds and securities chosen by the Contractor as <br /> the interest accrues. Bank and Contractor will execute an escrow agreement in the <br /> form provided by Owner. <br /> 3. Released after submission of fully executed retainage bond in the form provided by <br /> Owner. <br /> C. The Contractor shall designate the option desired at the time the Contract is executed. If <br /> the Contractor chooses option 2 (deposit in escrow account), Contractor agrees to assume <br /> full responsibility to pay all costs that may accrue from escrow services, brokerage charges <br /> or both, and further agrees to assume all risks in connection with the investment of the <br /> retained percentages in securities. The City may also, at its option, accept a bond in lieu of <br /> retainage. <br /> D. Retainage will be released when all of the following conditions are satisfied: <br /> 1. Sixty (60) days have elapsed following the completion of all Work specified in the <br /> Contract; and <br /> 2. The Contractor fulfilled all of all obligations of the Contractor under the Contract, <br /> including, but not limited to, the Contractor's furnishing all documentation required <br /> by Contract and law; and <br /> 3. A release has been obtained from the Washington State Department of Revenue; and <br /> 1 4. Affidavits of Wages Paid for the Contractor and all Subcontractors are on file with the <br /> Owner (RCW 39.12.040); and <br /> 5. A release has been obtained from the Washington State Department of Labor & <br /> Industries and the Washington State Employment Security Department; and <br /> 6. All claims, as provided by law, filed against the retainage have been resolved. In the <br /> event claims are filed and provided the conditions one through five are met, the <br /> Contractor will be paid the retained percentage less an amount sufficient to pay any <br /> such claims together with a sum determined by the Owner sufficient to pay the cost <br /> of claims and attorney's fees. <br /> 7. All other conditions required by law are satisfied. <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.