My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. A statement whether the Contractor believes the event may result in a Contract Claim <br /> for additional Contract Time or adjustment of the Contract Sum; <br /> 4. A date by which Contractor shall begin providing Supplemental Information as <br /> provided in this section. <br /> 10.3 Supplemental Information <br /> A. Contractor shall supplement the written Notice as soon as possible with a written <br /> statement providing the following: <br /> 1. The date of the event, incident, direction, and other pertinent information; <br /> 2. The nature and circumstances giving rise to the Notice; <br /> 3. The Contract provisions relating to, but not limited to, the event, incident, and <br /> direction; <br /> 4. The estimated dollar cost, if any, of the Extra Work, or Delay, or both and how that <br /> estimate was determined; and <br /> 5. An analysis of the schedule showing the schedule change or disruption if the <br /> Contractor is asserting a schedule change or disruption. <br /> B. Contractor Records. <br /> 1. Throughout any work related to a Notice, the Contractor shall keep complete and <br /> accurate records of costs, expenses, and time incurred for which Contractor will or <br /> may seek an adjustment. <br /> 2. Contractor waives and is stopped from seeking an adjustment of Contract Sum or <br /> Contract Time where Contractor fails to keep and maintain cost, timekeeping, and <br /> scheduling records segregated and contemporaneously allocated to the subject work <br /> for which an adjustment is sought. <br /> a. For example,failure to keep contemporaneous labor and equipment time records <br /> specifically and only allocated to each item of claimed Extra Work shall constitute <br /> a waiver of any Contract Claim for reimbursement or additional Contract Time for <br /> each such item of Extra Work. <br /> b. The Contractor shall permit the Owner access to these and any other records <br /> needed for evaluating requests for additional Contract Time or Contract Sum. <br /> ARTICLE 11 DIFFERING SITE CONDITIONS <br /> 11.1 General <br /> A. Notification <br /> 1. Upon discovery and before such conditions are disturbed, the Contractor shall <br /> promptly provide Notice to the City's Representative of: <br /> a. Pre-existing subsurface or latent physical conditions at the site differing materially <br /> from those indicated in this Contract, or <br /> Replacement of Reservoir 2 General Conditions <br /> WO# UP3658 00 72 13 - 61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.