Laserfiche WebLink
CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> DATE: August 13, 2020 ADDRESS: 17 East Valley Hwy E <br /> CONTRACTOR: Rodarte Construction, Inc. CITY/STATE: Auburn,WA 98092 <br /> PROJECT TITLE: Everett Station Parking Expansion WORK ORDER NO. 1807-018 <br /> DATE WORK COMPLETE: August 13, 2020 FINAL AMOUNT: $1, 098,743.37 <br /> Inclusive of WA State Sales Tax <br /> CONTRACTOR'S CERTIFICATION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work <br /> performed and material furnished to the City of Everett, that the same or any part thereof has not been <br /> paid, and that I am authorized to sign for the claimant; that I have not rented or purchased any equipment <br /> or materials from any employee of the City; I further certify that the attached final estimate is a true and <br /> correct statement showing all the monies due me from the City of Everett under this contract; that I have <br /> carefully examined said final estimate and understand the same and that I hereby release the City of <br /> Everett from any and all claims of whatsoever nature which I may have, arising out of the performance of <br /> said' ontract, which are not set forth in said estimate. II <br /> X ' 61. X 6 Gt� <br /> CONTRAC' R TI `` wsismio. <br /> Rodarte Construction, Inc. ,�••�P\1-�R�O,g9 ��� <br /> Subscribed and sworn to before me this 1� {I ' day of aLk . 2020 �' �� <br /> at NOTARY <br /> 1- X-Q PUBUC <br /> r. <br /> Not ry Public sitr psi <br /> •No. . <br /> in and for the State of Washington, residing at WCA Op WAS to__ <br /> VAC) . flitiossiO• <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> I Certify the attached final estimate to be <br /> based upon actual measurements and to <br /> be true and correct. APPROVED Date: 4-Z1-2o 2-1 <br /> X X_ <br /> Construction Manager Publ c Works Director <br /> Tom Fuchs Ryan Sass <br /> Revised 6/2012 <br />