Laserfiche WebLink
Run Date: 6/24/2020 City of Everett- Public Works Department Cutoff Date: 6/19/2020 <br /> Time: 3:44 PM Contract Estimate Voucher <br /> Project: 372 For Work Order#1807 Contractor: Rodarte Construction Inc <br /> EVERETT STATION PARKING Estimate#7 17 East Valley Hwy E <br /> EXPANSION <br /> WO 1807 BID:$1,122,050.75 Auburn,WA 98092 <br /> TOTAL BID:$1,122,050.75 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0001 UNEXPECTED SITE CHANGES EST 1.00 16,000.00 32,286.3000 32,286.3000 0.0000 32,286.30 32,286.30 0.00 <br /> 0002 SURVEYING LS 14,000.00 1.00 1.0000 0.9500 0.0500/ 14,000.00 13,300.00 700.00 <br /> 0003 RECORD DRAWINGS LS 3,000.00 1.00 1.0000 0.0000 1.0000r 3,000.00 0.00 3,000.00 <br /> 0004 SPCC PLAN LS 100.00 1.00 1.0000 1.0000 0.0000 100.00 100.00 0.00 <br /> 0005 POTHOLING EA 500.00 10.00 11.0000 11.0000 0.0000 5,500.00 5,500.00 0.00 <br /> 0006 TYPE B PROGRESS SCHEDULE LS 5,000.00 1.00 1.0000 0.9500 0.0500j 5,000.00 4,750.00 250.00 <br /> 0007 MOBILIZATION LS 76,000.00 1.00 1.0000 1.0000 0.0000 76,000.00 76,000.00 0.00 <br /> 0008 PROJECT TEMPORARY TRAFFIC CONTROL LS 5,000.00 1.00 1.0000 0.9500 0.0500/ 5,000.00 4,750.00 250.00 <br /> 0009 CLEARING AND GRUBBING ACRE 9,000.00 1.10 1.1000 1.1000 0.0000 9,900.00 9,900.00 0.00 <br /> 0010 REMOVING ASPHALT CONC.PAVEMENT SY 9.00 414.00 60.0000 60.0000 0.0000 540.00 540.00 0.00 <br /> 0011 REMOVAL OF SRUCTURES AND LS 2,600.00 1.00 1.0000 1.0000 0.0000 2,600.00 2,600.00 0.00 <br /> OBSTRUCTIONS <br /> 0012 SAW CUTTING LF 3.00 560.00 539.0000 539.0000 0.0000 1,617.00 1,617.00 0.00 <br /> 0013 REMOVING EXISTING CATCH BASIN EA 200.00 1.00 1.0000 1.0000 0.0000 200.00 200.00 0.00 <br /> 0014 HAZARDOUS MATERIAL EXCAVATION INCL CY 205.00 30.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> HAUL <br /> 0015 REMOVING CEMENT CONC.CURB AND LF 4.50 520.00 465.0000 465.0000 0.0000 2,092.50 2,092.50 0.00 <br /> GUTTER <br /> 0016 REMOVING CEMENT CONC.SIDEWALK SY 15.00 50.00 50.0000 50.0000 0.0000 750.00 750.00 0.00 <br /> 0017 REMOVING EXISTING LUMINAIRE EA 300.00 2.00 2.0000 2.0000 0.0000 600.00 600.00 0.00 <br /> 0018 REMOVE ECOLOGY BLOCK WALL SF 6.50 767.00 767.0000 767.0000 0.0000 4,985.50 4,985.50 0.00 <br /> 0019 REMOVING CHAIN LINK FENCE LF 8.00 410.00 410.0000 410.0000 0.0000 3,280.00 3,280.00 0.00 <br /> 0020 ROADWAY EXCAVATION INCL.HAUL CY 21.00 990.00 756.0000 756.0000 0.0000 15,876.00 15,876.00 0.00 <br /> 0021 COMMON BORROW INCL.HAUL CY 34.00 3,450.00 3,100.0000 3,100.0000 0.0000 105,400.00 105,400.00 0.00 <br /> 0022 STRUCTURE EXCAVATION CL B INCL HAUL CY 25.00 540.00 540.0000 540.0000 0.0000 13,500.00 13,500.00 0.00 <br /> 0023 SHORING OR EXTRA EXCAVATION CL B SF 0.10 4,430.00 4,430.0000 4,430.0000 0.0000 443.00 443.00 0.00 <br /> 0024 CPSSP STORM SEWER PIPE 12"DIAM LF 43.00 640.00 640.0000 640.0000 0.0000 27,520.00 27,520.00 0.00 <br /> 0025 DUCTILE IRON STORM SEWER PIPE 12" LF 75.00 130.00 125.0000 125.0000 0.0000 9,375.00 9,375.00 0.00 <br /> DIAM <br />