Laserfiche WebLink
STELLAR J CORPORATION <br /> Everett-2020 Trickling Filter Media Replacement STELLAR J <br /> City of Everett Work Oder Number: UP 3742-2 <br /> M.mpoq .own=d company <br /> SJC Project No: 20012 <br /> Title: Additional Painting Scope-TF Corrosion Report Revised <br /> Change Order Request No: 001 <br /> Description:After the filter media was removed,the owner arranged for the coatings of the trickling <br /> filter to be inspected by NW Corrosion Engineering. The report created by NWCE dated 2/22/2021 was <br /> provided to the contractor with repair reccomendations. SJC proposed a modification to the NWCE <br /> repairs called for and reccomended thicker coatings be applied to the repair areas once they where <br /> prepared with a wire wheel to remove loos or degreaded concrete surface.This change order covers <br /> the square footage over the 125%of the original 50 SF bid item quantity. Owner negociated a reduced <br /> cost for the excess footage from $850.00 sf to$344.00 sf prior to performing the work on the bid item <br /> overage. <br /> Contract Time Extension Request(Working Days): None <br /> DATE: 3/23/2021 <br /> Total Change Order Price: $110,265.76 <br /> DATE: 3/23/21 <br /> SUBMITTED BY: Destre Leifson PROJECT MANAGER <br /> Stellar J Corporation <br /> Notes: <br /> 1. This proposal is based on straight time labor and equipment unless expressly noted. <br /> Page 1 <br />