My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Capital Contract Change Order 1 Stellar J Corporation
>
Contracts
>
Capital Contract
>
Capital Contract Change Order 1 Stellar J Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:01:03 PM
Creation date
6/11/2021 1:00:51 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stellar J Corporation
Approval Date
6/1/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Trickling Media Filter Replacement
Public Works WO Number
UP3742-2
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0002378
Total Compensation
$110,256.76
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Stellar J Corporation 7/22/2020
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STELLAR J CORPORATION <br /> Everett-2020 Trickling Filter Media Replacement STELLAR <br /> City of Everett Work Oder Number: UP 3742-2 <br /> An rmployes monad company <br /> SJC Project No: 20012 <br /> Change Order Request No:001 <br /> Title:Additional Painting Scope-TF Corrosion <br /> Report Revised <br /> Description:After the filter media was removed,the owner arranged for the coatings of the trickling filter to be <br /> inspected by NW Corrosion Engineering. The report created by NWCE dated 2/22/2021 was provided to the <br /> contractor with repair reccomendations. SJC proposed a modification to the NWCE repairs called for and <br /> reccomended thicker coatings be applied to the repair areas once they where prepared with a wire wheel to <br /> remove loos or degreaded concrete surface.This change order covers the square footage over the 125%of the <br /> original 50 SF bid item quantity. Owner negociated a reduced cost for the excess footage from $850.00 sf to <br /> Contract Time Extension Request(Working Days): None <br /> DATE: 3/23/2021 <br /> Change Order Proposal Direct Cost Detail: <br /> LABOR: <br /> NO. DESCRIPTION UNIT UNITS UNIT COST TOTAL COST <br /> 1 HR $0.00 <br /> 2 _ HR $0.00 <br /> 3 HR $0.00 <br /> 4 HR $0.00 <br /> 5 HR $0.00 <br /> 6 _ HR $0.00 <br /> 7 HR $0.00 <br /> S/T Labor Cost: $0.00 <br /> MATERIALS: <br /> NO. DESCRIPTION UNIT UNITS UNIT COST TOTAL COST <br /> 1 LS $0.00 <br /> 2 LS $0.00 <br /> 3 LS $0.00 <br /> 4 LS $0.00 <br /> 5 LS $0.00 <br /> 6 LS $0.00 <br /> 7 LS $0.00 <br /> 8 LS $0.00 <br /> 9 LS $0.00 <br /> 10 $0.00 <br /> S/T Material Cost: $0.00 <br /> S/T Material Cost: $0.00 <br /> EQUIPMENT: <br /> NO. DESCRIPTION UNIT UNITS UNIT COST TOTAL COST <br /> 1 _ HR $0.00 <br /> 2 $0.00 <br /> 3 $0.00 <br /> S/T Equipment Cost: $0.00 <br /> SUBCONTRACTOR PRICE <br /> NO. DESCRIPTION UNIT UNITS UNIT COST TOTAL COST <br /> 1 SF 320.54 $344.00 _ $110,265.76 <br /> 2 $0.00 <br /> $0.00 <br /> 4 $0.00 <br /> S/T Subcontractor Cost: $110,265.76 <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.