Capital Contract Change Order 2 Combined Construction Inc
>
Contracts
>
Capital Contract
>
Capital Contract Change Order 2 Combined Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2021 1:23:26 PM
Creation date
6/11/2021 1:23:18 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc
Approval Date
6/1/2021
Department
Public Works
Department Project Manager
Gael Fisk/Mike Kangas
Subject / Project Title
Maple Heights Bridge Seismic Retrofit
Public Works WO Number
PW3693
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0002373
Total Compensation
$80,643.66
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Combined Construction Inc. 7/22/2020
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Maple Heights Seismic Retrofit <br /> Change Order No.; 002 <br /> Change Order Effective Date: May 21, 2021 <br /> Exhibit A—Description of Changed Work <br /> Revised Existing Bid Items <br /> Bid Item 36—Site Cleanup of Bio&Physical Hazards. Reduce existing item 31 entitled"Site Cleanup <br /> of Bio & Physical Hazards" by Force Account in the amount of negative $9,500.00 resulting in a <br /> $9,500.00 decrease to the Contract. <br /> Added Bid Items <br /> New Item 106 — Expansion Joint Modifications. Add new item # 106 entitled, "Expansion Joint <br /> Modifications" at the agreed Lump Sum price of$90,134.66, resulting in a $90,143.66 increase to the <br /> Contract. <br /> Exhibit B—Justification: <br /> Bid Item 36 — Site Cleanup of Bio & Physical Hazards. No Force Account extra work was required <br /> for this item. It has been reduced to offset the increase due to negotiated new Lump Sum item 106. <br /> New Item 106 — Expansion Joint Modifications. Modifications to the expansion joint is required due <br /> to the unanticipated additional width of the joint. <br /> Exhibit C—Additional Contract Time: <br /> There are no additional working days added for this change order. <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.