My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-04.4 Changes <br /> ' Delete 1-04.4 and substitute the following: <br /> 1-04.4 Changes <br /> ' 1-04.4(1) City's Right to Direct Changes to the Work <br /> (******) <br /> The City reserves the right to change the Work at any time. Such changes shall not <br /> invalidate the Contract nor release the Surety, and the Contractor agrees to perform the <br /> Work as changed. Among others, these changes and alterations may include: <br /> 1. Deleting or omitting any part of the Work, Equipment or material to be <br /> provided under this Contract, <br /> 2. Increasing or decreasing quantities, <br /> 3. Altering Specifications, designs, or both, <br /> 4. Altering the way the Work is to be done, <br /> 5. Adding new Work or Extra Work, <br /> 6. Altering facilities, Equipment, materials, services, or sites, provided by the <br /> City, and <br /> 7. Ordering the Contractor to accelerate or Delay the Work. <br /> If the Contractor and City do not agree upon scope of Work changed or adjustment to <br /> ' the Contract Sum and Contract Time, the City may, at its sole option, unilaterally direct <br /> the Contractor to implement City directed change by notice. The City shall not pay or <br /> be responsible or liable for changes implemented by the Contractor without explicit <br /> notice from the City to proceed. <br /> 1-04.4(2) Extra Work <br /> (******) <br /> ' At its sole option, the City may (1) perform Extra Work itself, (2) employ others to do it, <br /> (3) direct the Contractor to perform the Extra Work at existing unit Bid price, (4) direct <br /> the Contractor to perform the Extra Work at a mutually agreed upon price, or (5) direct <br /> ' the Contractor to perform the Extra Work on a Force Account basis. <br /> 1-04.4(3) Change Orders <br /> (******) <br /> Changes to the Work may result in an increase or decrease in Contract Sum,as provided <br /> ' in 1-09.4 Equitable Adjustment. Requests for an increase in Contract Time shall be made <br /> as provided in 1-08.3 PROGRESS SCHEDULE as applicable. Substantial changes in <br /> Contract Time, Contract Sum or Work will often be negotiated and agreed between the <br /> ' Contractor and City before the City directs the Contractor to proceed with the change. <br /> If the Contractor and City agree on the scope of Work and any changes to Contract Sum <br /> and Contract Time, the Contractor and City shall execute an agreed Change Order. <br /> ' However, if the Contractor and City do not agree, the City may, in its sole discretion, <br /> issue a unilateral Change Order in the form attached to the Contract Documents <br /> changing the scope of Work and making any adjustments to the Contract Sum pursuant <br /> ' to 1-09.4 EQUITABLE ADJUSTMENT and Contract Time pursuant to 1-08.8 <br /> EXTENSIONS OF TIME in such amount and for such time as the City believes <br /> appropriate. Contractor agrees to use the agreed Change Order form attached to the <br /> ' Contract Documents. The Contractor accepts all requirements, terms and conditions of <br /> a Change Order by: signing it; writing a separate acceptance; or by failing to notify the <br /> City immediately in writing that Contractor disagrees with the Change Order and does <br /> not intend to be bound by its terms. <br /> Water Main Replacement"V" Division 1 —GENERAL REQUIREMENTS April,2021 <br /> WO No—UP3730 SP—51 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.