My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> including, but not limited to, furnishing timely Notice of the event and its effect on <br /> ' Contract Time and Contract Sum as required herein. <br /> Contractor shall in no event be entitled to a Contract Claim or adjustment of Contract <br /> Sum or Contract Time based on an allegation that the pre-existing subsurface or latent <br /> physical conditions at the site differing materially from those indicated in this Contract <br /> unless Contractor establishes that it reasonably relied on the conditions indicated in this <br /> Contract when making its bid, that the actual conditions encountered on the site differed <br /> ' materially from those indicated in this Contract, and that such materially-different <br /> conditions were not foreseeable at the time of its bid. <br /> 1-05 CONTROL OF WORK <br /> ' 1-05.1 Authority of the Engineer <br /> Delete 1-05.1 and substitute the following: <br /> 1-05.1 City <br /> ' (******) <br /> The City, and the City's Representative, shall have the authority to act as the sole judge of <br /> the Work and materials with respect to both quantity and quality as set forth in the Contract. <br /> ' It is expressly stipulated that the Plans, Specifications and other Contract Documents set <br /> forth the requirements as to the nature of the completed Work and do not purport to control <br /> the method of performing Work except in those instances where the nature of the completed <br /> Work is dependent on the method of performance. <br /> The City has the authority to act, do, perform, and make all decisions and actions authorized <br /> by the Contract Documents, including, but not limited to, Change Orders, progress payments, <br /> contract decisions, acceptability of the Contractor's Work, and early possession. The City <br /> has the authority to accept or reject requests for progress payments that have been submitted <br /> by the Contractor and recommended by the City's Representative. The City has the authority <br /> ' to make determinations of the acceptability of the Work. The City also has the authority to <br /> accept or reject the City's Representative's recommendations regarding retention of defective <br /> Work. <br /> ' 1-05.2 Authority of Assistants and Inspectors <br /> Delete 1-05.2 and substitute the following: <br /> 1-05.2 City's Representative <br /> ' (******) <br /> The City's Representative shall be satisfied that all the Work is being done in accordance <br /> with the requirements of the Contract. The Contract and Specifications give the City's <br /> Representative authority over the Work. Whenever it is so provided in this Contract, the <br /> decision of the City's Representative shall be final. <br /> The City's Representative's decisions will be final on all questions including, but not limited <br /> ' to, the following: <br /> 1. Quality and acceptability of materials and Work; <br /> 2. Measurement of Work, whether lump sum, Force Account, or unit price; <br /> 3. Acceptability of rates of progress on the Work; <br /> 4. Interpretation of Plans and Specifications; <br /> 5. Determination as to the existence of changed or differing site conditions; <br /> 6. Fulfillment of the Contract by the Contractor; <br /> 7. Payments under the Contract including adjustment; <br /> ' 8. Suspension(s) of Work; <br /> Water Main Replacement"V" Division 1 —GENERAL REQUIREMENTS April,2021 <br /> WO No—UP3730 SP—55 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.