My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> with the Work represented by the Working Drawing until comments from the Engineer <br /> ' have been addressed. <br /> 3. Type 2E-Same as a Type 2 Working Drawing with Engineering as described below. <br /> 4. Type 3 - Submitted for City review and approval. Unless otherwise stated in the <br /> ' Contract, the Engineer will require up to 20 working days from the date the Working <br /> Drawing is received until it is returned to the Contractor. The Contractor shall obtain the <br /> Engineer's written approval before proceeding with the Work represented by the <br /> Working Drawing. <br /> 5. Type 3E-Same as a Type 3 Working Drawing with Engineering as described below. <br /> Supplement 1-05.3 as follows: <br /> ' The Contract Documents include Plans that show such details as are reasonably <br /> necessary to give a comprehensive understanding of the Work. The Contractor shall <br /> submit alterations affecting the requirements and information in the Plans in writing to <br /> the Engineer for approval prior to performing such Work. <br /> The Engineer may supplement the Plans with additional drawings and explanations, <br /> consistent with the purpose and intent of the original Plans, to detail and illustrate the <br /> ' Work. The Contractor shall perform the Work according to these supplemental drawings <br /> and explanations. <br /> In addition to supplemental drawings furnished by the Engineer,the Contract Documents <br /> ' may also be supplemented by Type 1,Type 2 or 2E, and Type 3 or 3E Working Drawings <br /> prepared by the Contractor, material supplier, or manufacturer, when necessary or as <br /> required by the Contract Documents to detail and illustrate portions of the Work. All <br /> types of Working Drawings shall be reviewed by the Engineer before work pursuant to <br /> ' those Working Drawings is performed. Type 3 and 3E Working Drawings may include, <br /> and not be limited to, shop details, erection plans, masonry lay-out diagrams, reinforcing <br /> steel and bending diagrams, post tensioning plans, shoring, cribbing, cofferdam, or <br /> falsework plans, formwork plans, or hydraulic items. Type 2 and 2E Working Drawings <br /> may include, and not be limited to, Catalog cuts or standard plans for commonly used <br /> manufactured items. <br /> ' The Contractor shall be fully responsible for the accuracy of dimensions and details on <br /> Working Drawings, and for complete conformity with the Contract Documents, even if <br /> the Working Drawings have been approved by the Engineer, or if the Contractor and the <br /> Engineer agree on dimensions and details. The City does not accept Working Drawings <br /> ' as accurate or adequate, and does not take responsibility for, or warrant that Working <br /> Drawings will meet Contract requirements. <br /> Engineer's review of Working Drawings shall not relieve Contractor from responsibility <br /> for variation from the requirements of the Contract Documents unless Contractor has in <br /> writing called the Engineer's attention to each such variation at the time of submission, <br /> and the Engineer has given written approval of each such variation by a specific written <br /> ' notation thereof incorporated in or accompanying the returned Working Drawing; nor will <br /> review by Engineer relieve Contractor from responsibility for errors or omissions in the <br /> Working Drawings or from responsibility for having complied with the provisions of this <br /> section. <br /> The Bid prices shall include all costs for furnishing Working Drawings and Submittals. <br /> The following listed sections of the Standard Specifications and Special Provisions <br /> require Working Drawings that may or may not be applicable to this specific project. This <br /> list is supplied as an aid to the Contractor and is by no means complete. Submittal <br /> requirements may be found in 1-05.3(1) or elsewhere in these Special Provisions. <br /> ' O <br /> Water Main ReplacementDIVISI "NV"2 EARTHWORK Division 1 -GENERAL REQUIREMENTS April,2021 <br /> WO No—UP3730 SP—57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.