My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Do NOT impair accessibility to existing or temporary pedestrian push buttons. City <br /> may allow activating pedestrian recall timing or other accommodations during <br /> construction. <br /> Supplement 1-07.23(1) by adding the following: <br /> At Everett and Hewitt Avenue weekday lane closures are restricted as follows: ' <br /> 1. Eastbound traffic lane closure restricted from 3:00 p.m. to 6:00 p.m. <br /> 2. Westbound traffic lane closure restricted from 7:00 a.m. to 9:00 a.m. <br /> At West Mukilteo Boulevard weekday lane closures are restricted as follows: ' <br /> 1. Northwest bound traffic lane closure restricted from 2:30 p.m. to 6:00 <br /> p.m. <br /> 2. Southeast bound traffic lane closure restricted from 7:00 a.m. to 9:30 <br /> a.m. <br /> Should Contractor find these lane closures too restrictive, Contractor is directed to <br /> 1-08.0(2) HOURS OF WORK regarding weekend working hours. <br /> Maintain a minimum of one lane remaining open to traffic along Olympic Boulevard, <br /> Ridgemont Drive, Pine Street and Wetmore Avenue. <br /> If Engineer determines the permitted closure hours adversely affect traffic, the <br /> Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br /> in writing of any change in the closure hours. <br /> No lane closures will be allowed on a holiday or holiday weekend, or after 12:00 <br /> p.m. on a day prior to a holiday or holiday weekend. A holiday weekend is defined <br /> as having a holiday fall on Friday, Saturday, Sunday or Monday. <br /> Contractor shall provide a uniformed off-duty Police Officer to control traffic in critical I <br /> situations as determined by the Engineer. The uniformed officer shall be paid under <br /> contract item "Traffic Control —Off-Duty Police Officer." <br /> Contractor shall notify the local Fire, Police and Engineering Departments before , <br /> the beginning of each phase of construction so that these agencies may re-route <br /> their emergency vehicles around the construction zone. The non-emergency phone <br /> number for Everett Police is 258-2484, for Fire Dispatch is 257-8757, and for Public <br /> Works Engineering is 257-8800. 111 <br /> Contractor shall notify City of Everett Transit at 425-257-8984 and Community <br /> Transit at 425-348-7100 of all street closures or delays at least 24 hours in advance <br /> to enable rerouting of buses. <br /> Contractor shall notify the property owners at least 72 hours in advance to enable them <br /> to remove vehicles parked in the vicinity of Work. Towing vehicles shall be the <br /> responsibility of the Contractor and no additional payment will be made. <br /> Further supplement 1-07.23(1) by adding the following: <br /> 1-07.23(1)A General Requirements Traffic <br /> The following general requirements apply to all Work on the Project: <br /> Prepare and submit to Engineer a Traffic Control Plan in accordance with 1- <br /> 10.2(2)TRAFFIC CONTROL PLANS. <br /> Refer to 1-08.4(2) SPECIAL CONSTRUCTION CONSTRAINTS regarding <br /> construction constraints resulting from traffic control. <br /> Notify all affected property owners prior to commencing the barricading of <br /> streets, sidewalks and driveways. <br /> Water Main Replacement"V" Division 1 -GENERAL REQUIREMENTS April, 2021 <br /> WO No-UP3730 SP-86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.