Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 5. Updated Progress Schedules shall indicate progress of the Work to the <br /> date of submission by drawing a vertical line down the schedule to <br /> represent Work completed to date. <br /> 1-08.3(3)B Schedule Contents <br /> All Progress Schedules shall: 1 <br /> 1. Include essential sub-schedules of related activities. <br /> 2. Allow for timely incorporation of any other's work under separate contract <br /> with City. ' <br /> 3. Allow for timely incorporation of work provided and installed by City. <br /> 4. Include submittals to agencies required for performance of Work with <br /> sufficient, adequate and reasonable time for review, comment and return <br /> submittals. <br /> 5. Allow for appropriate durations to complete activities that may be affected <br /> by weather during the time of year the activities are performed. <br /> 6. Identify logical connections, dependency upon preceding or succeeding <br /> activities, restraints or constraints, planned start and completion dates, <br /> duration, actual start and completion dates, and variances. ' <br /> 7. Activity durations shall not exceed twenty (20) days. The activities shall <br /> be related to early and late start, early and late finish, and Float dates. <br /> Activities listed in the Preliminary Schedule shall be included in all subsequent ' <br /> schedules. No activity in the Preliminary Schedule shall be deleted without prior <br /> written consent of the Representative and City. <br /> Contractor shall notify City's Representative and City in writing and highlight the ' <br /> addition of all activities to the schedule after the Preliminary Schedule. <br /> The Baseline Schedule shall be part of the Contract. <br /> Each activity shall be identified with a number that incorporates the Specification ' <br /> section number. <br /> Activities shall be consistent and identified with the Schedule of Values (if <br /> applicable) or unit prices of the bid schedule. All elements and items in the <br /> Schedule of Values or unit prices in the bid schedule shall appear in the Progress <br /> Schedules. <br /> Contractor shall provide sub-schedules for each stage/phase of Work as required <br /> by City, City's Representative, or Subcontractor. <br /> Contractor shall provide sub-schedules to define major portions of the entire <br /> schedule. Include long-lead-time items for Equipment and material that requires <br /> long fabrication time. Order these well in advance of required delivery time to <br /> sequence with overall construction schedule. <br /> Each schedule shall show accumulated percentage of completion of each activity, <br /> and total percentage of Work completed, as of the date of payment application. <br /> Contractor shall include in each schedule as activities the submission, review, and <br /> correction of Submittals, Shop Drawings, Product Data and Samples. The <br /> schedule should show: <br /> 1. The dates for Contractor's Submittals. <br /> 2. A minimum of 14 calendar days duration for City or City's <br /> Representative's review. <br /> 3. Indicate decision data for selection of finishes. <br /> Water Main Replacement"V" Division 1 —GENERAL REQUIREMENTS April,2021 <br /> WO No—UP3730 SP—94 <br />