My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> c. Reschedule activities. <br /> If requested by the City's Representative, the Contractor shall prepare a proposed , <br /> schedule revision demonstrating a plan to make up the lag in progress and insure <br /> completion of the Work within the Contract Time. All actions taken to return the Project <br /> to the accepted schedule are at the Contractor's expense. <br /> The Contractor shall pay all costs incurred by the City that result from the Contractor's <br /> action to return the Project to its accepted schedule, including, but not limited to, <br /> additional, overtime, or third party inspection, design and construction management <br /> service costs. Contractor agrees that City shall deduct such charges from payments <br /> due the Contractor. It is further understood and agreed that none of the services <br /> performed by the City's Representative in monitoring, reviewing and reporting Project <br /> status and progress shall relieve the Contractor of responsibility for planning and <br /> managing construction Work in conformance with the construction schedule. <br /> 1-08.4(2) Special Construction Constraints <br /> (******) r <br /> The work on Wetmore Avenue, is adjacent to Everett Community College and Whittier <br /> Elementary School. Parking in this area is in high demand. Work shall be scheduled to <br /> minimize disruption to schools. Pedestrian access shall be maintained throughout the <br /> project. <br /> Start with water main installation work on Wetmore Ave. to allow for the road restoration <br /> and final overlay paving work on Wetmore Ave. to be substantially complete prior to <br /> September 20, 2021. <br /> Protect all areas adjacent the project work zone and the right-of-way from unnecessary <br /> disturbance. Restore all disturbed areas to proposed or pre-existing conditions. <br /> Protect all existing private utilities and public utilities to remain. <br /> Maintain an approved set of Construction Plans and Specifications for the Work on the <br /> Construction Site at all times, including a copy of the current City of Everett Design and <br /> Construction Standards. <br /> Backfill, completely fence off or cover all open excavations with steel plates at the end <br /> of the workday or when no Contractor personnel are on-site to protect the Public and <br /> protect installed pipes and structures from construction and traffic loads prior to final <br /> grading and paving. <br /> Refer to 1-08.0(2)for work hours. <br /> Refer to 1-07.23(1) for construction under traffic and 1.07.23(1)A for general traffic <br /> requirements. <br /> Provide notice in accordance with 8-20.3(1)of these Special Provisions to City of Everett <br /> Traffic Department before cutting induction loop wiring. <br /> Pay particular attention to maximum length allowed between sampling points on new <br /> water main in accordance with 7-09.3(24)H FINAL FLUSHING AND TESTING. <br /> City may approve full block street closures as part of Contractor's Temporary Traffic <br /> Control Plan. Maintain pedestrian access during full block closures. Temporary roadway <br /> and sidewalk patching shall be completed prior to re-opening a closed block of street. <br /> Pay particular attention to maximum length allowed between sampling points on new <br /> water main in accordance with 7-09.3(24)H FINAL FLUSHING AND TESTING. <br /> Upon completion of pipe installation and trench backfilling to specifications, promptly <br /> restore street, driveway and sidewalk surfaces using Temporary Pavement Patch in <br /> accordance with Section 5-06.3(6) TEMPORARY PAVEMENT PATCHING and permit <br /> public use and access for City inspection activities. <br /> Water Main Replacement"V" Division 1 -GENERAL REQUIREMENTS April,2021 <br /> WO No-UP3730 SP-96 <br />