My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> receipt of the acceptance Notice in writing, indicating acceptance of all of its terms and <br /> ' provisions. <br /> Subsequent to the Substantial Completion date, the City may exclude the Contractor <br /> from the Work during such periods when construction activities might interfere with the <br /> ' intended operation of the Project. The City, however, shall allow the Contractor <br /> reasonable access for completion or correction of incomplete Punch List items. <br /> 1-08.5(3) Acceptance of Work <br /> Upon completion of the Project, including, but not limited to, record drawings, as-builts, <br /> required reports and operations and maintenance manuals,the Contractor shall so notify <br /> ' the City's Representative in writing. Upon receipt of the notification, the City's <br /> Representative will promptly, by personal inspection, determine the actual status of the <br /> Work in accordance with the terms of the Contract. If the City's Representative finds <br /> materials, Equipment, or workmanship that do not meet the terms of the Contract, it will <br /> ' prepare a Punch List of such items and submit it to the Contractor. Following completion <br /> of the corrective work by the Contractor, the City's Representative will notify the City that <br /> the Work has been completed in accordance with the Contract. The City shall make the <br /> ' final determination of acceptability and completion. For portions of the Project not <br /> previously accepted as substantially complete, the conditions of guarantee shall <br /> commence on the date that the City determines the Project is complete. <br /> ' 1-08.6 Suspension of Work <br /> Supplement 1-08.6 by adding the following: <br /> 1-08.6(1) Suspension Procedures <br /> ' (******) <br /> The City may, at its convenience and at any time and without cause, suspend all or any <br /> part of the Work by notice in writing to the Contractor. The Contractor will be allowed an <br /> ' increase in the Contract Sum or an extension of Contract Time, or both, directly <br /> attributable to any suspension in accordance with the Change Order procedures in these <br /> Special Provisions; provided, (1) the Contractor shall not be entitled to any increase to <br /> ' the extent caused by the Contractor and (2) Contract Sum increases and Contract Time <br /> extensions for suspension caused by Third Parties or Force Majeure Events are limited <br /> as set forth in 1-09.11A(3)D THIRD PARTY CAUSED DELAYS AND FORCE MAJEURE. <br /> The Contractor shall resume the Work within five(5)calendar days after receiving written <br /> ' notice from the City to do so. <br /> 1-08.7 Maintenance During Suspension <br /> ' Delete all of 1-08.7 and substitute the following: <br /> Before and during any suspension (as described in Section 1-08.6)the Contractor shall <br /> protect the Work from damage or deterioration. Suspension shall not relieve the <br /> ' Contractor from anything the Contract requires unless this Section states otherwise. <br /> At no expense to the City, the Contractor shall provide through the construction area a <br /> safe, smooth, and unobstructed roadway, sidewalk, and path for public use during <br /> suspension, as required in 1-07.23 PUBLIC CONVENIENCE AND SAFETY. This may <br /> require a temporary road or detour. <br /> If the Engineer determines that the Contractor failed to pursue the Work diligently before <br /> the suspension, or failed to comply with the Contract or orders, then the Contractor shall <br /> maintain the temporary roadway, sidewalk, and path in use during suspension. In this <br /> case, the Contractor shall bear the maintenance costs. If the Contractor fails to maintain <br /> the temporary roadway, sidewalk, and path the City will do the Work and deduct all <br /> t resulting costs from payments due to the Contractor. <br /> Water Main Replacement"V" Division 1 —GENERAL REQUIREMENTS April,2021 <br /> WO No—UP3730 SP—99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.