My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> after the Substantial Completion Date, liquidated damages shall be assessed on the <br /> basis of direct engineering and related costs assignable to the project until the actual <br /> Physical Completion Date of all the Contract Work. The Contractor shall complete the <br /> remaining Work as promptly as possible. Upon request by the Project Engineer, the <br /> Contractor shall furnish a written schedule for completing the physical Work on the <br /> Contract. <br /> 1-08.10 Termination of Contract <br /> 1-08.10(1) Termination for Default <br /> Delete all of 1-08.10(1) and substitute the following: <br /> The City may terminate the Contract upon written notice to Contractor and its Surety <br /> whenever the Contractor is deemed to be in default or fails to fulfill, in a timely and <br /> proper manner, one or more Contract obligations, or is in violation of any provisions <br /> or covenants of the Contract. Termination shall be effective upon Contractor's and <br /> Surety's receipt of such notice <br /> For purposes of this section, the Contractor shall be deemed to be in default upon <br /> the occurrence of one or more of the following events: <br /> 1. If Contractor is bankrupt or insolvent. <br /> 2. If Contractor makes a general assignment for the benefit of creditors. <br /> 3. If a trustee or receiver is appointed for Contractor, or for any of <br /> Contractor's property. <br /> 4. If Contractor files a petition to take advantage of any debtor's law, or to <br /> reorganize under any bankruptcy chapter or law. <br /> 5. If Contractor repeatedly fails to make prompt payments to subcontractors <br /> or others for labor, materials, or Equipment. <br /> 6. If Contractor disregards laws, ordinances, rules, regulations, or orders of <br /> public bodies having jurisdiction. <br /> 7. If Contractor disregards the authority of the City or City's Representative. <br /> 8. If Contractor substantially violates the provisions of the Contract <br /> Documents or fails, neglects, or refuses to proceed in compliance with <br /> the provisions of the Contract Documents. <br /> 9. If the Contractor made material misrepresentations to the City with <br /> respect to: (a) its qualifications or those of its subcontractors; (b) its or its <br /> subcontractors' ability to perform the Work in a timely, workmanlike <br /> manner; (c) the materials installed or to be installed; or (d) progress pay <br /> estimates. <br /> 10. If Contractor fails to supply sufficient skilled workers or suitable materials <br /> or equipment. <br /> 11. If Contractor refuses or fails to prosecute the Work with such diligence as <br /> will ensure its Physical Completion within the original Physical <br /> Completion time and any extensions of time which may have been <br /> granted to the Contractor by change order or otherwise. <br /> 12. If Contractor disregards laws, ordinances, rules, codes, regulations, <br /> orders or similar requirements of any public entity having jurisdiction. <br /> 13. If Contractor performs Work which deviates from the Contract, and <br /> neglects or refuses to correct rejected Work. <br /> 14. If Contractor otherwise violates in any material way any provisions or <br /> requirements of the Contract. <br /> Water Main Replacement"V" Division 1 —GENERAL REQUIREMENTS April,2021 <br /> WO No—UP3730 SP-101 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.