My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 111 CITY OF EVERETT SPECIAL PROVISIONS <br /> Without prejudice to any other remedy it may have under law or the provisions of <br /> the Contract, or both, the City may terminate this Contract for convenience, with or <br /> without cause, in whole or in part, at any time by giving written Notice to the <br /> Contractor. Termination will be effective upon receipt of such Notice by the <br /> Contractor. The Contractor shall immediately discontinue work and take all <br /> reasonable steps with its suppliers and subcontractors to minimize cancellation <br /> charges and other costs. <br /> In the event of termination for convenience, the Contractor shall be compensated <br /> as provided in 1-09.5 DELETED OR TERMINATED WORK. The Contractor will be <br /> entitled to no further payments whatsoever for the Work. <br /> In the event of a breach or default by the Contractor, City may, at its sole option, <br /> terminate this Contract in whole or in part for convenience as provided herein. The <br /> City may pursue any and all contractual, legal and equitable remedies for such <br /> breach or default. Absent an express written agreement to the contrary, a <br /> termination for the City's convenience shall not be deemed a waiver or release of <br /> any rights by the City nor shall the City be estopped from any legal or equitable <br /> remedies that may be appropriate. <br /> Supplement 1-08.10 by adding the following: <br /> 1-08.10(6) Termination by Contractor after Suspension <br /> (******) <br /> If the Work has been wholly suspended pursuant to 1-08.6 SUSPENSION OF WORK <br /> for more than 90 calendar days as measured from the date of the Notice to suspend, <br /> then the Contractor may terminate this Contract by providing City with 14 calendar days' <br /> Notice that the Contractor shall deem the Contract to be terminated if the City does not <br /> provide Contractor with notice to resume Work within those 14 calendar days. Such <br /> termination shall be treated as a termination for the City's convenience pursuant to 1- <br /> 08.10(2) TERMINATION FOR PUBLIC CONVENIENCE. <br /> 1-08.10(7) Contractor Obligations upon Termination <br /> (******) <br /> IOn receipt of notice of termination, the Contractor shall immediately discontinue the <br /> Work but shall do such Extra Work as may be ordered by the City's Representative or <br /> City to safeguard the Work then completed and the materials and Equipment then <br /> delivered to the site of the Work and to leave the Work in a safe and useful condition. <br /> Payment for this Extra Work will be made in accordance with 1-09.4 EQUITABLE <br /> ADJUSTMENT. <br /> 1-08.10(8) Ownership of Materials upon Termination <br /> (******) <br /> As of the termination date,whether effected by the City or Contractor as provided herein, <br /> all the Contractor's right, title, and interest in and to materials ordered by the Contractor <br /> prior to termination, whether or not they have been delivered to the site of Work, shall <br /> be vested in the City, and the Contractor shall, upon demand of the City, execute and <br /> deliver to the City all requisite bills of sale, assignments, and other documents of transfer <br /> 1 that may be necessary to give effect to the intention of the termination procedures set <br /> forth above. <br /> 1-08.10(9) Opportunity to Cure <br /> (******) <br /> If the Contractor has not already had an opportunity to cure the default or breach the <br /> City shall specify the default or breach and a reasonable period of time to allow the <br /> Contractor to cure the default or breach. The Notice of termination will state the time <br /> Water Main Replacement"V" Division 1 —GENERAL REQUIREMENTS April,2021 <br /> WO No—UP3730 SP—103 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.