My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Use red pen or pencil to make changes on the record drawings. Notations are to be <br /> neat, legible, clear and concise. I <br /> Record information concurrently with the progress of construction. Conceal no work <br /> until the required information is verified and recorded. <br /> 1-08.11(3) Payment I <br /> No separate payment shall be made for the preparation of record drawings. All costs <br /> associated with the preparation of record drawings shall be included in the unit contract <br /> prices of other items in the Contract. I <br /> 1-09 MEASUREMENT AND PAYMENT <br /> 1-09.1 Measurement of Quantities <br /> Supplement 1-09.1 by adding the following: <br /> Measurement by the Ton: Where items are specified to be paid for by the ton it will be <br /> the Contractor's responsibility to see that a certified weight ticket is given to the City's <br /> Inspector on the Project at the time of delivery of materials for each truckload delivered. <br /> Pay quantities will be prepared on the basis of certified weight tickets delivered to the <br /> City's Inspector at time of delivery of materials. Tickets not received by the City's <br /> Inspector on day of delivery will not be honored for payment. <br /> 1-09.3 Scope of Payment <br /> Supplement 1-09.3 by adding the following: <br /> 1-09.3(1) Schedule of Values <br /> The Contractor shall submit a Schedule of Values in accordance with 1-08.0(1) PRE- <br /> CONSTRUCTION CONFERENCE. If the Project contains Unit Price Work, in whole or <br /> in part, then the Schedule of Values for that portion of the Work shall also be based on <br /> unit prices. If the Proposal Form calls for a lump sum price, in whole or in part, then the <br /> Schedule of Values shall: reasonably allocate the Contract Sum among the various <br /> portions of the Work; be complete; be organized to include detailed breakdown of each <br /> major unit of the Work; be organized to correspond to Contractor's schedule; break down <br /> the Contract Sum showing the value assigned to each part of the Work; include an <br /> allowance for profit and Overhead; include Unit Price Work, if and to the extent indicated <br /> on the Proposal Form; be so organized as to facilitate assessment of Work and payment <br /> of Subcontractors; and be balanced. To the greatest extent possible, the breakdown <br /> shall use the same tasks or units as the Contractor's schedule. Contractor shall provide <br /> documentation substantiating the cost allocation if asked by the City's Representative. <br /> Upon acceptance of the Schedule of Values by the City's Representative, it shall be used <br /> as a basis for all requests for payment. <br /> 1-09.4 Equitable Adjustment <br /> Supplement 1-09.4 by adding the following: <br /> Other means to establish the reasonable cost of the Work not defined by unit prices <br /> include, and is not limited to, 1-09.6 FORCE ACCOUNT, the Schedule of Values, or <br /> estimating manuals. <br /> 1-09.4(1) General111 <br /> The following shall apply in determining the amount of an equitable adjustment of <br /> Contract Sum: <br /> 1. Except as otherwise expressly provided, Contractor will only be paid for costs <br /> it clearly and convincingly proves it actually and directly incurred, and shall <br /> Water Main Replacement"V" Division 1 —GENERAL REQUIREMENTS April,2021 <br /> WO No—UP3730 SP—106 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.