Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> not fully completed or corrected is less than retainage stipulated in the Contract <br /> Documents, and if bonds have been furnished, the written consent of Surety to <br /> payment of the balance due for that portion of the Work fully completed and <br /> accepted shall be submitted by the Contractor to the City's Representative prior to <br /> certification of such payment. Such payment shall be made under terms and <br /> conditions governing final payment, except that it shall not constitute a waiver of <br /> claims. <br /> Acceptance of final payment by the Contractor, a Subcontractor or material or <br /> Equipment supplier shall constitute a waiver of Contract Claims by that payee, <br /> except those Contract Claims previously timely and completely submitted that <br /> remain pending at the time of final payment, provided that Contractor specifically so <br /> notifies the City in writing prior to the City making such final payment. Payment by <br /> the City shall not release the Contractor or its Surety from any obligation under the <br /> Contract or under the payment and performance bond. <br /> Upon completion of all Work and after final inspection, the amount due the <br /> Contractor under the Contract will be paid based upon the final estimate made by <br /> the Engineer and presentation of a Final Contract Voucher Certification signed by <br /> the Contractor. Such voucher shall be deemed a release of all claims of the <br /> Contractor unless a claim is filed in accordance with the requirements of 1-09.11 <br /> DISPUTES AND CLAIMS and is expressly excepted from the Contractor's <br /> Certification on the Final Contract Voucher Certification. <br /> ' 1-09.9(5) Back Charges to Contractor <br /> The Contractor shall pay the City on demand everything charged to it under the terms <br /> of this Contract. Such charges may be deducted by the City from money due or to <br /> become due to the Contractor under the Contract. The City may recover such charges <br /> from the Contractor or from its Surety. <br /> Contractor agrees to pay the costs of overtime or excessive inspection and observation <br /> costs incurred by the City. Overtime inspection shall include inspection required during <br /> Saturdays, Sundays, City holidays and weekdays in excess of 40 hours per week or <br /> outside of normal working hours and inspections or observations that result in an <br /> inspector or observer working more than 40 hours in a week. Costs of such overtime or <br /> excessive inspection or observation include architecture, engineering, construction <br /> management services, inspection, general supervision and overhead expenses that are <br /> directly chargeable to the overtime or excessive work. Contractor agrees that City will <br /> deduct such charges from payments due the Contractor. In the event the City issues a <br /> Change Order requiring the Contractor to work in excess of the established schedule of <br /> working hours, the City will not charge the Contractor for associated inspection costs. <br /> The Contractor shall be compensate the City for the actual costs of engineering, <br /> inspection, general supervision, right-of-way costs, permit fees, overhead expenses, <br /> and any other ascertainable direct costs to the City that are directly chargeable to the <br /> Work and that accrue during the period of such extension. The actual costs do not <br /> include charges for final inspection and preparation of the final payment by the City. <br /> 1-09.9(6) Retainage <br /> Pursuant to RCW Chap. 60.28, a sum of five percent of the monies earned by the <br /> Contractor will be retained from progress estimates. In addition to protecting the <br /> interests of those identified in RCW Chap. 60.28, such retainage will be used as a trust <br /> fund for the protection of the City. <br /> At the option of the Contractor, monies retained under the provisions of RCW 60.28 will <br /> be: <br /> Water Main Replacement"V" Division 1 —GENERAL REQUIREMENTS April,2021 <br /> WO No—UP3730 SP—113 <br /> I <br />