Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 2 — EARTHWORK <br /> 2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP <br /> ' 2-01.2 Disposal of Usable Material and Debris <br /> Supplement 2-01.2 by adding the following: <br /> When requested by the property owner, trim trees of sufficient size for fire wood, cut <br /> into two-foot rounds and neatly stack on adjacent property. Remove and dispose of <br /> stumps, large roots, limbs and branches. <br /> 2-01.2(1) Disposal Method No.1 -Open Burning <br /> Delete the first paragraph and substitute the following. <br /> Opening burning is not permitted within the city limits. <br /> 2-01.4 Measurement <br /> Delete all paragraphs of 2-01.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-01.5 Payment <br /> Delete all paragraphs in 2-01.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions of these Special Provisions and <br /> ' Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> If there is no bid item to cover clearing and grubbing, then clearing and grubbing shall <br /> be included with other work with no direct compensation made. <br /> 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS <br /> 2-02.1 Description <br /> Delete 2-02.1 and substitute the following: <br /> �I The Work shall consist of the removal, disposal or abandoning in-place of various <br /> existing improvements including, but not limited to, pavements, structures, pipe, curbs, <br /> curb and gutter, gutter, valves, manholes, catch basins and other items necessary for <br /> ' the accomplishment of the improvement. <br /> 2-02.3 Construction Requirements <br /> 2-02.3(2) Removal of Bridges, Box Culverts and Other Drainage Structures <br /> Supplement 2.02.3(2) by adding the following: <br /> When removing structures such as manholes, inlets, or vaults that interfere with <br /> the construction, properly plug all pipe openings abandoned in-place watertight <br /> with Commercial Concrete, or with mortar and masonry, blocks or brick. <br /> Backfill voids with suitable job excavated material where structures are removed. <br /> Compact suitable backfill material in accordance with 2-03.3(14)C. <br /> If the Engineer determines the job-excavated material unsuitable for backfill then <br /> Contractor shall obtain Gravel Borrow or CDF as directed, to complete backfilling <br /> the voids. If a pay item for Gravel Borrow or CDF is not included in the Proposal, <br /> then providing Gravel Borrow or CDF for backfill shall be considered as Extra <br /> Work under 1-04.4. <br /> Watermain Replacement"V" Division 2-EARTHWORK April,2021 <br /> WO No.-UP3730 SP-131 <br />