My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 2 — EARTHWORK <br /> 2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP <br /> ' 2-01.2 Disposal of Usable Material and Debris <br /> Supplement 2-01.2 by adding the following: <br /> When requested by the property owner, trim trees of sufficient size for fire wood, cut <br /> into two-foot rounds and neatly stack on adjacent property. Remove and dispose of <br /> stumps, large roots, limbs and branches. <br /> 2-01.2(1) Disposal Method No.1 -Open Burning <br /> Delete the first paragraph and substitute the following. <br /> Opening burning is not permitted within the city limits. <br /> 2-01.4 Measurement <br /> Delete all paragraphs of 2-01.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-01.5 Payment <br /> Delete all paragraphs in 2-01.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions of these Special Provisions and <br /> ' Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> If there is no bid item to cover clearing and grubbing, then clearing and grubbing shall <br /> be included with other work with no direct compensation made. <br /> 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS <br /> 2-02.1 Description <br /> Delete 2-02.1 and substitute the following: <br /> �I The Work shall consist of the removal, disposal or abandoning in-place of various <br /> existing improvements including, but not limited to, pavements, structures, pipe, curbs, <br /> curb and gutter, gutter, valves, manholes, catch basins and other items necessary for <br /> ' the accomplishment of the improvement. <br /> 2-02.3 Construction Requirements <br /> 2-02.3(2) Removal of Bridges, Box Culverts and Other Drainage Structures <br /> Supplement 2.02.3(2) by adding the following: <br /> When removing structures such as manholes, inlets, or vaults that interfere with <br /> the construction, properly plug all pipe openings abandoned in-place watertight <br /> with Commercial Concrete, or with mortar and masonry, blocks or brick. <br /> Backfill voids with suitable job excavated material where structures are removed. <br /> Compact suitable backfill material in accordance with 2-03.3(14)C. <br /> If the Engineer determines the job-excavated material unsuitable for backfill then <br /> Contractor shall obtain Gravel Borrow or CDF as directed, to complete backfilling <br /> the voids. If a pay item for Gravel Borrow or CDF is not included in the Proposal, <br /> then providing Gravel Borrow or CDF for backfill shall be considered as Extra <br /> Work under 1-04.4. <br /> Watermain Replacement"V" Division 2-EARTHWORK April,2021 <br /> WO No.-UP3730 SP-131 <br />
The URL can be used to link to this page
Your browser does not support the video tag.