Laserfiche WebLink
a <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> 5-04.3(15) Sealing Pavement Surfaces <br /> Apply a fog seal where shown in the plans. Construct the fog seal in <br /> accordance with Section 5-02.3. Apply the fog seal prior to opening to traffic <br /> unless Engineer approves otherwise. <br /> 5-04.3(16) HMA Road Approaches <br /> Construct HMA approaches at the locations shown in the Plans or where <br /> staked by the Engineer. Perform the Work in accordance with Section 5-04. <br /> 5-04.4 Measurement <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1- <br /> 09 MEASUREMENT AND PAYMENT of the Standard Specifications. 111 <br /> 5-04.5 Payment <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1- <br /> 09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> Supplement Division 5 of the Standard Specifications by adding the following: <br /> 5-06 PAVEMENT PATCHING <br /> (******) I <br /> 5-06.1 Description <br /> This Work shall consist of the reconstruction and patching of trenches and other <br /> excavations in paved streets and other paved areas. <br /> 5-06.2 Materials <br /> Provide materials conforming to the requirements specified for the materials in Sections 5- <br /> 04 & 5- 05 of the Standard Specifications except as modified by these Special Provisions. <br /> For HMA pavement patching provide HMA CL 1/2", PG 64-22 as specified in Section 5-04 <br /> of the Standard Specifications. <br /> Provide asphalt for temporary pavement patch as either: cold mix asphalt (MC 250) per <br /> Section 9-02 of the Standard Specifications or hot mix asphalt (HMA CL 1/2", PG 64-22). <br /> Mineral aggregate of MC 250 shall meet the same requirements as the aggregates used in <br /> HMA CL 1/2", PG 64-22. <br /> For cement concrete base pavement patching provide high early strength cement concrete. <br /> Provide minimum 4000 psi mix having minimum 3000 psi compressive strength after curing <br /> time of three days. <br /> Provide crushed surfacing top course used for pavement patching conforming to the <br /> requirements of 9-03.9(3) of the Standard Specifications. <br /> 5-06.3 Construction Requirements I <br /> 5-06.3(1) General <br /> Schedule pavement patching to accommodate the demands of traffic and perform as <br /> rapidly as possible to provide maximum safety and convenience to public traffic. <br /> Placing and compact the trench backfill and the preparation and compaction of the <br /> subgrade in accordance with the various applicable sections of the Standard <br /> Specifications except as modified by these Special Provisions. <br /> Water Main Replacement"V" Division 5—SURFACE TREATMENTS April,2021 <br /> WO No.—UP3730 AND PAVEMENTS <br /> SP-166 <br /> I <br />