Thomco Construction Inc. 6/14/2021
>
Contracts
>
Capital Contract
>
Thomco Construction Inc. 6/14/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:53:29 AM
Creation date
6/18/2021 10:03:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction Inc.
Approval Date
6/14/2021
Council Approval Date
5/19/2021
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement V
Public Works WO Number
UP3730
Tracking Number
0002953
Total Compensation
$1,924,004.26
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Thomco Construction Inc. 6/22/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 5-06.3(4) HMA on Granular Base <br /> After the Crushed Surfacing Top Course subgrade has been leveled and compacted, <br /> HMA CL 1/2", PG 64-22 shall be placed to a thickness of one inch greater than the <br /> existing asphalt pavement depth or to a minimum of three inches, whichever is greater. <br /> Asphalt shall be compacted to 92-percent of maximum density as determined by <br /> WSDOT Test Method 705. <br /> 5-06.3(5) Untreated Roadway Surfaces <br /> Existing crushed rock, gravel, and oil mat streets shall be restored with Crushed <br /> Surfacing Top Course to a compacted depth of four inches within the neat lines of the <br /> trench. Crushed surfacing shall be mixed, placed, spread and shaped in accordance <br /> with the requirements of Section 4-04 of the Standard Specifications. I <br /> 5-06.3(6) Temporary Pavement Patching <br /> The Contractor shall furnish, place and maintain temporary pavement patching as <br /> shown on the Plans and at locations as directed by the Engineer, until such time as a <br /> permanent patch of permanent paving can be made. <br /> Provide a temporary patch as required to reopen roadway during construction as that <br /> withstands existing traffic loads and volumes. Options include, and are not limited to, <br /> cold mix asphalt (MC 250), hot mix asphalt (HMA CL 1/2", PG 64-22), or secured steel <br /> roadway plates. <br /> Provide temporary asphalt patching where roadway or walk is needed for vehicular or <br /> pedestrian traffic, during the construction period, until permanent pavement and <br /> sidewalks can be constructed. <br /> In the event that the temporary surface subsides after the initial placement, apply <br /> additional MC 250 or HMA(as approved by the Engineer) as necessary to maintain the <br /> surface. <br /> Stockpile of plant mix and crushed surfacing for temporary patching shall be provided <br /> on the site by the Contractor. <br /> Prior to final restoration of the pavement, the Contractor shall be responsible for <br /> removing and disposing of temporary pavement patching materials. <br /> 5-06.3(7) Incidental Pavement Patching <br /> Incidental pavement patching shall be done only at the direction of the Engineer for <br /> patching and restoring areas between the back of new sidewalks and adjacent asphalt <br /> driveways, paving ramps at the ends of sidewalks, and gutters that are adjusted to <br /> grade. <br /> Asphalt for incidental pavement patching shall be HMA CL 1/2", PG 64-22. <br /> 5-06.4 Measurement <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1- <br /> 09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 5-06.5 Payment <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1- <br /> 09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 1 <br /> Water Main Replacement"V" Division 5—SURFACE TREATMENTS April,2021 <br /> WO No.—UP3730 AND PAVEMENTS <br /> SP-168 <br /> i <br />